A work order storm control method, device and system
A control method and technology of a control device, which are applied in transmission systems, digital transmission systems, data exchange networks, etc., can solve problems such as low degree of intelligence, impact on fault handling efficiency, and poor timeliness.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0076] Such as figure 1 As shown, the work order storm control method of the first embodiment of the present invention includes:
[0077] Step 11: Match the obtained alarms with dispatch identifiers to obtain the first alarm that needs to be dispatched;
[0078] Step 12: In a preset dimension, according to the preset detection time interval, the number of dispatch orders that the first alarm is about to be generated within the preset detection time period is calculated to obtain a statistical result;
[0079] Step 13. Determine whether there is a work order storm based on the statistical result;
[0080] Step 14. If there is a work order storm, generate a processing command to change the flow of the work order sent to the first processing staff to the second processing staff;
[0081] It should be noted that the first processing personnel is a front-line fault processing personnel, and the second processing personnel is a preprocessing personnel.
[0082] What needs to be said is that wh...
Embodiment 2
[0112] Such as image 3 As shown, the work order storm control method of the second embodiment of the present invention includes:
[0113] Step 31: Match the obtained alarms with dispatch identifiers, and obtain the first alarm that needs to be dispatched;
[0114] Step 32: In a preset dimension, according to the preset detection time interval, the number of dispatch orders that the first alarm is about to be generated within the preset detection time period is counted to obtain a statistical result;
[0115] Step 33: Determine whether there is a work order storm based on the statistical result;
[0116] Step 34: If there is a work order storm, generate a processing command to change the flow of the work order sent to the first processing staff to the second processing staff;
[0117] Step 35: If there is a work order storm, a work order storm alarm is generated.
[0118] It should be noted that if it is detected that a work order storm is about to occur, it is necessary to notify the ne...
Embodiment 3
[0126] Such as Figure 5 As shown, the third embodiment of the present invention provides a work order storm control device, including:
[0127] The dispatch alarm acquiring module 51 is configured to match the acquired alarms with dispatch identifiers to obtain the first alarm that needs dispatch;
[0128] The statistics module 52 is configured to perform statistics on the dispatch volume of the first alarm to be generated within the preset detection time period according to the preset detection time interval in a preset dimension, and obtain a statistical result;
[0129] The judging module 53 is configured to judge whether there is a work order storm according to the statistical result;
[0130] The work order storm processing module 54 is configured to, if there is a work order storm, generate a processing command that changes the work order sent to the first processing staff to the second processing staff.
[0131] Wherein, the preset dimension is the dimension of the triple combin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


