Water-permeable pavement and pavement method thereof
A permeable pavement and permeable concrete technology, which is applied to roads, roads, pavement details, etc., can solve the problems of permeable pavement strength reduction, contact area reduction, material strength reduction, etc., and achieve good load transfer performance, small deformation, and enhanced bearing capacity and durability effects
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2017-11-17
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the laying of a permeable pavement, in particular to a permeable pavement and a laying method thereof. Background technique
[0002] With the popularization of permeable pavement related knowledge and the replacement of the entire road paving technology level, more and more cities have begun to use permeable pavement as the preferred paving material for urban roads and public areas. However, permeable pavement also has deficiencies and shortcomings. The first problem of permeable pavement is its low strength. Thanks to the large porosity of permeable concrete, permeable pavement has a good drainage effect, but at the same time it also reduces the strength of permeable pavement. Case. A large void ratio reduces the contact area between the aggregate and the aggregate, which leads to a decrease in the strength of the material. The large void ratio also increases the contact area of the binder with air and sunlight. Therefore, ...
Examples
Embodiment Construction
[0027] In order to further illustrate the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings and embodiments, but they should not be construed as limiting the protection scope of the present invention.
[0028] Such as figure 1 and image 3 As shown, a kind of permeable pavement comprises: paving element 1, filter layer 2, first permeable concrete base 6, second permeable concrete base 4 and crushed stone layer 7, crushed stone layer 7 is laid on the upper surface of the consolidated foundation, A water collector 10 is arranged in the gravel layer 7, and the water collector is connected to the drain pipe 11. The upper surface of the gravel layer 7 is laid with a first permeable concrete base 6, and the upper surface of the first permeable concrete base 6 is laid with a second permeable concrete base. Concrete base 4, the second permeable concrete base 4 is provided with a glass fiber geogrid 5, the upper su...