The invention discloses a rapid underground diaphragm wall obstacle removing method which specifically comprises the following steps: cleaning the ground surface, leveling the ground and hardening the construction ground with concrete. The
immersed tube inserting plane position of the rectangular
steel tube is marked on the ground; a rectangular steel
pipe is inserted, soil in the steel
pipe is taken out by combining a crane with soil taking equipment during
insertion, and
slurry is injected; hoisting the rock into a horizontal high-speed rock
crusher by using a crane, and crushing the rock; adjusting the height of the rectangular steel
pipe and repeatedly crushing rocks; pulling out the rectangular steel pipe, moving the horizontal position of the steel pipe, and repeating rock crushing construction; the steps are repeated, after all obstacles are removed, the
machine is hoisted out, and the rectangular steel pipe is pulled out; according to the method, the high-speed drilling
machine is adopted to drive the cutter head to
grind the underground diaphragm wall, drilling
coring treatment is replaced, and the method has the advantages that
slag is easy to remove, and machines are not clamped; the scheme that a protective layer of the underground diaphragm wall is reserved instead of drilling to penetrate through the underground diaphragm wall is adopted, and the method has the advantages of well controlling
cracking and deformation of the existing
station structure.