A construction method for rapidly filling a subgrade in road construction
A construction method and roadbed technology, applied to roads, fillings, roads, etc., can solve problems such as problems, non-use, road settlement, etc., and achieve the effects of ensuring service life, enhancing the ability to resist natural disasters, and stabilizing the roadbed structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0015] Carry out the construction method of fast filling embankment in road construction, comprise the following steps:
[0016] (1) Stakeout: According to the coordinates of the middle pile of the main line given by the design, use the total station to release the middle pile position, set a middle pile at 20 meters for the section with large ups and downs, set a middle pile at 40 meters for the relatively flat section, and then use a level Measure the original ground level elevation pile by pile, measure the cross section with the total station, draw the ground line and subgrade section on the MiG paper, calculate the position of the left and right side piles, and release the side piles on the spot;
[0017] (2) Cleaning up the list: Use manual or mechanical methods to clean up weeds, tree roots, organic impurities and garbage within the construction area. All the cleaned up waste should be transported to the designated place. The bulldozer loosens 15-25cm, and then uses a g...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com