Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Three-dimensional grouting construction method of gangue filling in horizontal working face of short-wall roadway

A technology for mining and construction methods of short-wall roadway, which is applied in the fields of backfill, mining equipment, earth-moving drilling, etc., can solve the problems of large demand for fly ash, large interference and high cost

Active Publication Date: 2020-04-17
SHANDONG UNIV OF SCI & TECH
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Document 2 (Feng Wulin. Discussion on the control of surface subsidence by gangue and fly ash filling mining [J]. Coal Mine Modernization, 2015, 1: 106-107+109) proposed a method for controlling surface subsidence by gangue and fly ash filling mining. The basic principle is Firstly, the mixture of fly ash and gangue is filled. The filling process is a parallel operation method of mining while filling and compacting. Mining before the frame and filling after the frame are carried out simultaneously; then the strength of the filling body is improved by grouting. The gangue body is reinforced by grouting (grouting), and the grouting materials are fly ash, high-water materials and water with good fluidity. It is sent out from the roadway and connected with the grouting station; this method has great interference to production, the demand for fly ash is large and the cost is relatively high, and the grouting effect is poor due to the grouting treatment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Three-dimensional grouting construction method of gangue filling in horizontal working face of short-wall roadway
  • Three-dimensional grouting construction method of gangue filling in horizontal working face of short-wall roadway
  • Three-dimensional grouting construction method of gangue filling in horizontal working face of short-wall roadway

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention is described in detail below in conjunction with accompanying drawing and specific embodiment:

[0023] The present invention designs a three-dimensional grouting construction method for gangue filling in the horizontal working face of short-wall roadway mining, which is realized through the following steps:

[0024] 1) Headway excavation: Excavate a number of sideways 1 in the horizontal working face, and set up gangue and slurry walls 2 at one end of each levelway 1, such as figure 1 , 2 As shown, the width of the lane is a , a Satisfy the following formula: , where, m is the thickness of the immediate roof; is the direct top tensile strength; is the bulk density of the direct top.

[0025] 2) Arrangement of grouting pipes: two side grouting pipes 11 are arranged at the bottom of both sides of each entryway 1, and the two side grouting pipes 11 are connected with the main road grouting pipe 3, and the main road grouting pipe 3 It is co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a three-dimensional grouting construction method for gangue filling in a horizontal working face of a short-wall roadway, relates to a gangue filling and grouting construction method, and designs two-side grouting pipes, connections and two-side grouting on both sides of the bottom of a level roadway A number of horizontal grouting pipes between the pipes and vertical grouting pipes vertically and fixedly connected to the horizontal grouting pipes form a stable frame structure. Grouting is carried out after the gangue is piled up. The three-dimensional grouting process ensures a better Grouting effect; fixed diagonal braces are designed between the horizontal grouting pipe and the vertical grouting pipe to make the frame structure more stable; after the grout inside the vertical grouting pipe is solidified, a support pipe containing solidified grout is formed inside, and Under the action of the slurry, the rain gangue accumulations form a common carrier and jointly support the overlying strata, so that the subsidence of the overlying strata is small, and the dust reduction effect on the surface is better.

Description

technical field [0001] The invention relates to a gangue filling and grouting construction method, in particular to a three-dimensional grouting construction method for gangue filling in a horizontal working face of a short-wall roadway. Background technique [0002] In order to effectively reduce mining subsidence and subsidence damage, gangue filling, as a green mining technology, is widely used in coal mine production. The filling effect of gangue has an important relationship with the density, filling rate, integrity and strength of gangue. In order to effectively improve the effect of filling and reducing settlement of gangue, many scholars have proposed the mining method of gangue filling and grouting. It is a comprehensive subsidence reduction technology combined with slurry reinforcement and mining. The basic principle is that on the basis of gangue filling, high-pressure slurry is injected into the gangue filling body, and the fluidity of the slurry is gradually pen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21F15/00E21F15/04E21D11/10
CPCE21D11/10E21F15/005E21F15/04
Inventor 尹大伟陈绍杰江宁李志远常西坤郭惟嘉陈兵马宏发刘兴全汪锋赵增辉
Owner SHANDONG UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products