Quick installation process for shaft equipment
An installation process and wellbore technology, which is applied in vertical shaft equipment, mining equipment, earthwork drilling, etc., can solve the problems of taking up a lot of time for up and down operation, long construction process time and high labor cost, so as to improve construction quality and speed up production efficiency. , the effect of simple operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0077] The following is a specific embodiment of the present invention, and the present invention will be further described with reference to the accompanying drawings.
[0078] Such as figure 1 with figure 2 As shown, it is the construction target wellbore of the present invention, including traffic tank counterweight No. 1 tank road 1, traffic tank counterweight 2, traffic tank counterweight No. 2 tank road 3, No. 1 bracket 4, No. 1 tank road beam 5. No. 2 bay 6, transportation tank 7, transportation tank 1, tank road 8, No. 3 bay 9, transportation tank 2, tank road 10, No. 2 tank road beam 11, No. 1 pipeline 12, No. 4 bay 13 , No. 3 tank beam 14, cage 15, No. 1 cable support 16, counterweight 17, well wall 18, wellbore 19, No. 2 cable support 20, No. 2 pipeline 21, No. 3 pipeline 22, No. 4 pipeline 23 and so on.
[0079] A process for rapid installation of wellbore equipment in this embodiment includes the following steps:
[0080] ①Install a hanging system at the wellbore;
[0...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap