Power supply method for a phosphate fertilizer enterprise to run on a turbine generator isolated network when the main network is out of power
A technology of turbo generator and power supply method, applied in the field of power grid, which can solve problems such as tripping of incoming line circuit breaker, power-off shutdown of production system, and large boiler damage, so as to achieve the effect of ensuring normal operation and saving electricity costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Such as figure 1 As shown, the main network includes incoming power supply 1, first isolating switch 2, second isolating switch 3, transformer 4, neutral point ground knife 5, lightning arrester 6, discharge gap 7, power distribution room 1 busbar 8, power distribution room 2 busbar 9, the first incoming circuit breaker 001, the first circuit breaker 002, the second circuit breaker 011, the seventh circuit breaker 016, the first synchronous measuring voltage transformer 20 of the 1# steam turbine generator, and the 2# steam turbine generator The third synchronous measurement voltage transformer 25, the second incoming line circuit breaker 161 and the loop formed therein; the isolated grid includes two isolated grids, one of which includes 1# steam turbine generator 17, the twelfth circuit breaker 107 , Phase I busbar 10 of the sulfuric acid workshop, tenth circuit breaker 105, equipment of the first phase of the sulfuric acid workshop 16, 1# turbogenerator second-phase ...
Embodiment 2
[0036] When there is a planned power outage or maintenance of the main network, the power supply of the production system can form an isolated grid in advance to supply the power of the production system. According to the stable power generation load of 1# and 2# steam turbine generators, the load of the production device is adjusted to be less than or equal to the power load Stable power generation load of 1# and 2# steam turbine generators; release the tripping platen of the eighth circuit breaker 103 and ninth circuit breaker 104 of the second incoming line circuit breaker 161, release the tripping linkage of the first incoming line circuit breaker 001 Lock the tripping plate of the eighth circuit breaker 103 and the ninth circuit breaker 104; disconnect the first incoming line circuit breaker 001, so far all the power consumption of the production system is powered by 1# and 2# steam turbine generators, and the production system forms an isolated grid power supply; Break th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com