Combined reinforcing method for soil by drainage consolidation via mechanical pressurizing and compaction

A technology of drainage consolidation and treatment method, applied in the field of foundation reinforcement treatment and soft soil foundation reinforcement treatment, can solve the problems of high construction cost, long construction period, large settlement after construction, etc., so as to reduce construction cost and improve construction efficiency. , the effect of reducing the construction period

Inactive Publication Date: 2019-01-15
HANGZHOU YONGCHUANG INFRASTRUCTURAL ENG SCI & TECHCAL CO LTD
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The above-mentioned drainage consolidation method has a very long construction period, usually six months to one year to complete, so the construction cost is very high and the efficiency is very low
[0004] The above drainage consolidation method is only suitable for large area construction
Moreover, since the height of the piled load is limited, it cannot be applied to occasions with high load-bearing requirements for soil
[0005] In addition, the bearing capacity of the foundation treated by the surcharge preloading method is low, and the post-construction settlement is large. Therefore, composite reinforcement such as sand piles, powder spray piles, mixing piles, and prefabricated pipe piles are still needed in the future.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Combined reinforcing method for soil by drainage consolidation via mechanical pressurizing and compaction
  • Combined reinforcing method for soil by drainage consolidation via mechanical pressurizing and compaction
  • Combined reinforcing method for soil by drainage consolidation via mechanical pressurizing and compaction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0146] The method of mechanical compression, compaction, drainage and consolidation of soil combined with reinforcement and reinforcement is carried out in the following steps:

[0147] 1) Reference Figure 28 , Pave a layer of geo-reinforced material 45 on the engineering undisturbed soil 44 in the construction area until all the construction areas have been laid; the geo-reinforced material 45 is a reinforced belt 45-3.

[0148] 2) The crane 18 hoists the modular soil pressure forming device 19 to the current construction area.

[0149] 3) Reference Figure 29 , The modular soil pressure forming device 19 performs vibration pressure on the soil after the composite geotechnical material is laid, and the self-weight of the modular soil pressure forming device 19 exerts longitudinal static pressure on the soil; the impact hammer 13 on the soil The body exerts a longitudinal impact force; the vibration device 15 causes the device 19 to vibrate, and then applies high-frequency lateral p...

Embodiment 2

[0153] The method of mechanical compression, compaction, drainage and consolidation of soil combined with reinforcement and reinforcement is carried out in the following steps:

[0154] 1) Reference Figure 32 , The composite geotechnical material 45-1 is made into a shape matching the convex structure, and side plates 45-5 are also arranged around to form a prefabricated frame member. Reference Figure 33 , Place a layer of composite geotechnical material prefabricated components on the engineering undisturbed soil 44 in the current construction area.

[0155] 2) The crane hoists the modular soil pressure forming device to the current construction area.

[0156] 3) The modular soil pressure forming device is used to compress and squeeze the soil after the geo-reinforced material is laid, so as to make the composite geomaterial 45-1 and the soil form an interweaving and extrusion mixture. , To achieve the effect of composite reinforcement of geo-reinforced materials and soil, and re...

Embodiment 3

[0161] The method of mechanical compression, compaction, drainage and consolidation of soil combined with reinforcement and reinforcement is carried out in the following steps:

[0162] 1) Reference Figure 36 , Lay a layer of geomembrane 45-2 on the undisturbed soil of the construction area, and sprinkle dry cement 62 on this layer of geomembrane 45-2; then lay a layer of sand and gravel aggregate 43-2 on this layer Sprinkle cement dry powder 62 on the aggregate 43-2; finally, pave a layer of modified soil 47. The modified soil 47 is laid according to the following method: the undisturbed soil and cement are mixed in a mixer according to the proportion to form modified soil, and then the fluid modified soil mixture is poured on the construction area, and the paving is smooth.

[0163] 2) The crane hoists the modular soil pressure forming device to the current construction area.

[0164] 3) The modular soil pressure forming device is used to compress, squeeze, drain and consolidate ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a combined reinforcing method for soil by drainage consolidation via mechanical pressurizing and compaction. The method is characterized by comprising the following steps that1) engineering undisturbed soil is laid with at least one layer of geotechnical reinforcement material; and 2) a modularized soil pressurizing and forming device carries out pressurizing compaction drainage and consolidation on the soil, so that the laid geotechnical reinforcement material and the soil are extruded and mixed mutually, composite reinforcement is realized between the soil and the geotechnical reinforcement material, and the constructional weak soil is reinforced. The modularized soil pressurizing and forming device comprises a top rack, a pressurizing and molding module and a soil intensity detector, and the pressurizing and molding module comprises protruded bodies. The soil is extruded for drainage and molded rapidly, and the method is suitable for reinforcing soft soil foundations in a shallow or intermediate shallow layer, and especially for drainage and consolidation on weak soil with high water content as mud, fluid mud, sandy soil, mud and sand blown back fillingsoil, a pond, a lake, a dam, a deposition pond and mining mixed soil and the like.

Description

Technical field [0001] The invention relates to the field of foundation reinforcement treatment, in particular to the field of reinforcement treatment of soft soil foundations, in particular to a method for mechanically pressing, compacting, draining and consolidating soil combined with reinforcement. Background technique [0002] The soil structure is generally composed of a mixture of solids, liquid water and air. The different mixing ratios of various substances produce unequal pressure-bearing capacity. When the pressure is greater than the pressure of the soil, the pressure will cause side shift and compression. Settlement requires an artificial change in the mixing structure ratio of the undisturbed soil body. Under the action of applied pressure, the density of the solid particles in the soil body is increased. The drainage material in the soil body is used to discharge liquid water and The air channel changes the mixing structure of the soil to continuously increase the p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D3/00E02D3/10
Inventor 任再永
Owner HANGZHOU YONGCHUANG INFRASTRUCTURAL ENG SCI & TECHCAL CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products