Determination method of uplink control channel scheduling unit, base station and user equipment
A technology of scheduling unit and determination method, applied in the directions of transmission path sub-channel allocation, wireless communication, electrical components, etc., can solve problems such as not raised
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0170] In this preferred embodiment, when the scheduling unit is selected, the reserved scheduling unit and / or unknown (Unknown) scheduling unit and / or random access channel (Random Access Channel, RACH) after the initial scheduling unit are scheduled The unit is excluded and selected between the uplink scheduling unit and the downlink scheduling unit. Wherein, the downlink scheduling unit includes a pure downlink scheduling unit and a downlink main scheduling unit. The uplink scheduling unit includes a pure uplink scheduling unit and an uplink main scheduling unit. If it is an uplink-master scheduling unit, it is required that the number of uplink symbols included in the uplink-master scheduling unit meets the requirements. If it is a downlink-master scheduling unit, it is required that the number of uplink symbols included in the downlink-master scheduling unit meets the requirements.
[0171] The base station and the UE respectively derive the scheduling unit used by the ...
Embodiment 2
[0181] In this preferred embodiment, when selecting a scheduling unit, the downlink scheduling unit and / or reserved scheduling unit and / or Unknown scheduling unit and / or RACH scheduling unit after the initial scheduling unit are excluded, and the uplink scheduling unit Select from the unit. Wherein, the downlink scheduling unit includes a pure downlink scheduling unit and a downlink main scheduling unit. The uplink scheduling unit includes a pure uplink scheduling unit and an uplink main scheduling unit. If it is an uplink-master scheduling unit, it is required that the number of uplink symbols included in the uplink-master scheduling unit meets the requirements.
[0182] The base station and the UE respectively derive the scheduling unit used by the PUCCH and the mapping of the PUCCH in the derived scheduling unit backward from the initial scheduling unit according to the rules. Specifically: exclude the downlink scheduling unit and / or the reserved scheduling unit and / or th...
Embodiment 3
[0187] In this preferred embodiment, when the scheduling unit is selected, it is required that when the PUCCH spans multiple slots, the number of symbols and symbol positions contained in the PUCCH in the multiple slots are the same. If the scheduling unit has the number of symbols and symbol positions that meet the requirements, the scheduling unit is considered as a slot that spans multiple slots for the PUCCH.
[0188] The base station and the UE respectively derive the scheduling unit used by the PUCCH and the mapping of the PUCCH in the derived scheduling unit backward from the initial scheduling unit according to the rules. Specifically, it is required that the PUCCH spans multiple slots, and the number of symbols and symbol positions contained in the PUCCH in the multiple slots are the same. If the scheduling unit has the number of symbols and symbol positions that meet the requirements, the scheduling unit is considered as a slot that spans multiple slots for the PUCCH...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


