Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of concrete pouring system for tunnel secondary lining

A construction method and concrete technology, which is applied in the direction of tunnel lining, tunnel, earthwork drilling, etc., can solve the problems that it is impossible to accurately judge whether the second lining vault concrete is filled, the concrete construction is invisible, and the vibration radius is small. Vault second lining is void and concrete is not dense, realizes visual operation, and meets the effect of construction requirements

Active Publication Date: 2020-05-19
NO 4 ENG CO LTD OF CHINA RAILWAY 11 BUREAU GRP +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the traditional tunnel lining process, the steel formwork of the second lining trolley directly overlaps the concrete of the upper slab before concrete pouring, and there is no relevant top pressure control, so it is easy to crack the lapping concrete and cause the construction joints to fall off; during the pouring process, The ground pump pumps the concrete to each feed port of the second lining trolley, and vibrates with a hand-held vibrator at the feed port, and uses an electric attached vibrator to vibrate when pouring the vault. However, due to The second lining vault has dense steel bars, and the vault concrete cannot be vibrated manually, and the frequency of the vibrator is insufficient and the vibration radius is small, so it is impossible to ensure whether the vault concrete is dense and full, which will easily lead to voids in the tunnel lining vault concrete and insufficient concrete strength Quality problems; the process of the second lining arch top punching process, because the concrete construction is invisible, the traditional method depends on whether there is any grout leakage in the end formwork, and it is impossible to accurately judge whether the second lining arch concrete is filled, which may easily lead to the hollowing out of the tunnel lining arch concrete ; The quality of the tunnel lining vault caused a great safety risk to the later train operation, so the traditional tunnel lining process can no longer meet the construction needs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of concrete pouring system for tunnel secondary lining
  • Construction method of concrete pouring system for tunnel secondary lining
  • Construction method of concrete pouring system for tunnel secondary lining

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0046] see figure 1 , the construction method of the concrete pouring system for the second lining of the tunnel, wherein the pouring system includes a flow monitoring device, a mold entry temperature monitoring device, a pressure visualization soft lap device, a plurality of high-frequency pneumatic vibrators 12, and a plurality of automatic plug-in vibrating devices 18. Vault endoscopic anti-vacation device, pressure sensing sheet 32, strip pressure sensing gasket 33, vault exhaust overflow grouting device, gas compressor 13 and electric control box 40.

[0047] see figure 2 , the flow monitoring device includes a three-dimensional laser scanner and a flow sensor 1, and the flow sensor 1 is installed on the concrete main delivery pump pipe 2; all the concrete entering the second lining is transported through the concrete main deli...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method of a tunnel two-lining concrete pouring system, which comprises the following steps of: carrying out full-coverage scanning on a primary cross section byusing a three-dimensional laser scanner, calculating an estimated pouring two-liner concrete square quantity, and transmitting the estimated pouring two-liner concrete square quantity to an electriccabinet (40); installing a strip-shaped pressure sensing gasket (33) and a transparent pipe (30); installing a pressure sensing chip (9), a pressure sensing piece (32) and a temperature sensor (5); arranging a high-frequency pneumatic vibrator (12) and an automatic insertion type vibrator (18), and installing a flow sensor (1); stopping jacking when the pressure sensing value of the pressure sensing chip (9) is greater than the pressure resistance value of the upper plate two-lining concrete, installing a comprehensive pipe (3); pressing air, monitoring the square quantity of the concrete; carrying out pneumatic vibrating; carrying out insertion vibrating; judging that the concrete is full, and finishing pouring the concrete. The automation of the pouring of the two-lining concrete is achieved.

Description

technical field [0001] The invention relates to a concrete pouring system, and more specifically relates to a construction method for a tunnel secondary lining concrete pouring system, which belongs to the technical field of tunnel lining construction. Background technique [0002] At present, with the rapid development of high-speed rail in my country, there are more and more tunnels; with the continuous improvement of tunnel lining quality and standardized construction requirements, the quality requirements of tunnel lining concrete are getting higher and higher. [0003] In the traditional tunnel lining process, the steel formwork of the second lining trolley is directly overlapped with the concrete of the upper slab before concrete pouring, and there is no relevant top pressure control, so it is easy to crack the lapped concrete and cause the construction joints to fall off; during the pouring process, The ground pump pumps the concrete to each feed port of the second li...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/10G01L5/00
Inventor 王更峰杨沿周军伟袁中华焦贤福刘素云
Owner NO 4 ENG CO LTD OF CHINA RAILWAY 11 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products