Resource scheduling method and computer equipment
A resource scheduling and equipment technology, applied in the computer field, can solve problems such as power reduction, affect user experience, seesaw effect, etc., achieve the effect of improving the determination speed and avoiding the seesaw effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0051] Existing performance control mechanisms, such as CPU energy-aware scheduling (EAS) and the governor mechanism based on frequency point adjustment, are only based on load, and there is a problem of excessive performance supply, resulting in degradation of power consumption and thermal control. Taking video playback as an example, the frame number of video playback is not a fixed 60 frames, but 24 or 25 or 30 frames. The current performance control mechanism does not consider different frame numbers when supplying foreground computing resources, and there is a problem that excessive resource supply leads to excessive power consumption. On the other hand, the CPU, GPU, and DDR device scheduling strategies are independent and affect each other, which can easily lead to the seesaw effect. For example, when the power is sufficient, the performance is prioritized, causing the power to drop rapidly, and the phone continues to heat up; when the power is not sufficient, power con...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com