Construction Method of Pile Foundation of Bridges and Caves in Karst Area
A construction method and technology in karst areas, applied in bridges, bridge construction, infrastructure engineering, etc., can solve problems such as ground subsidence, achieve the effects of saving construction costs, speeding up the progress of hole formation, and ensuring the quality of pile formation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0069] In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0070] Such as Figure 1 to Figure 4 Commonly shown, a construction method for bridge karst cave pile foundations in karst areas, including the following steps: punching and karst cave treatment, repeating the punching and karst cave treatment until the final hole is formed; this embodiment specifically includes: construction preparation, initial selection of the scheme , punching, karst cave treatment, continue punching... (cycle karst cave treatment, choose treatment plan and punching according to actual effect), and form holes.
[0071] Cave treatment, specifically includes the following steps...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com