An immersive nuclear power plant main equipment process simulation deduction method and system
A technology of process simulation and main equipment, which is applied in aerospace equipment, mechanical mode conversion, electrical digital data processing, etc., can solve problems such as difficult access, inability to find process risk points in advance, and inability to conduct simulation previews during on-site construction, so as to achieve optimization Process design scheme, improve model processing efficiency, and improve the effect of design results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] figure 1 It is an immersive nuclear power plant main equipment process simulation deduction method shown in the embodiment of the present invention, such as figure 1 As shown, the method includes the steps of:
[0061] S1. According to the process requirements, design and model the main equipment process to generate original model data;
[0062] S2. Perform automatic lightweight processing on the original model data based on the model vector information, and complete the production and rendering of texture maps;
[0063] S3. Import the original model data into a simulation development engine, construct a three-dimensional virtual scene, and create a dynamic simulation process in the three-dimensional virtual scene according to the process flow of the main equipment process;
[0064] S4. Select an immersive interactive device as a hardware deployment platform, connect the immersive interactive device to the three-dimensional virtual scene, and perform deduction and eva...
Embodiment 2
[0110] Figure 4 An immersive nuclear power plant main equipment process simulation deduction system provided for this embodiment, such as Figure 4 As shown, the system includes a data input module 10, a data processing module 20, a simulation development module 30 and an integrated interactive system 40;
[0111] Among them, the data input module 10 is used to design and model the main equipment process according to the process requirements to generate the original model data; the data processing module 20 is used to perform automatic lightweight processing on the original model data based on the model vector information, and complete the texture map Production and rendering; the simulation development module 30 is used to import the original model data into the simulation development engine, construct a three-dimensional virtual scene, and make a dynamic simulation process in the three-dimensional virtual scene according to the process flow of the main equipment process; in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com