At that time, there was no way to prevent the dust from entering the case. We had to
clean up the dry dust from the power case of the electromagnetic heater and replace it with a new circuit board for the user to continue using.
The second technical problem is that the power supply of the electromagnetic heater is damaged due to the over-undervoltage.
Because the four-eye
power strip is made of
Bakelite, it is not only brittle but also heavy, and it is easy to collide and damage when walking and moving. When working, it is inevitable to pull the wires, and the wire ends are easy to pull out from the
power strip, or the
power strip has been damaged. It is fully plugged, or the wire close to the plug is broken. At this time, it will take a long time for the user to find an electrician to solve the problem. In many cases, they are unwilling to wait. I don’t know much about
electricity usage, so I thought it would be enough to connect it. In addition, I don’t have any tools at hand. Most of the time, I use my mouth to bite off the end of the thread, hook the two threads on the two fuses of the three-phase switch knife, or Plug it into the two live wire holes of the four-eye socket, so that when the power is turned on, it will be 380 volts, and the
machine will be burned directly
Because there are many places in the tunnel where the construction environment is harsh at the same time, it is easy to break the zero line in the middle, causing the zero point drift of the equipment in front of the construction to damage the equipment
Because in the traditional process, the plug-in strip is used for the climbing
welding machine and the
angle grinder, and the power of the climbing
welding machine and the angle
grinding machine is generally only a few hundred watts, so the
diameter of the wire equipped with the plug-in strip is only 1.5 square millimeters to 2.5 square millimeters, because this electromagnetic heater is a new product of 3500 watts, although it is emphasized in the instruction manual to use cables with a
diameter of more than 4 square millimeters, it is still ignored by many workers, and it is also because the electromagnetic heater works every time For two to three seconds, pause for one to two minutes, so although the line is overloaded, it will not cause high temperature in the line, so it will not be noticed, but the
voltage drop of each working voltage is particularly large, the voltage before shooting is 230 volts, After shooting, it drops to 150 volts. Such a large
voltage drop will cause great damage to various components.
At the same time, the
transformer of the tunnel is installed outside the entrance of the tunnel, and the tunnel is continuously excavated. The
diameter of the following wires cannot meet the needs of large
electrical equipment, and the cables used in the mobile electric box are limited by the frequent and convenient movement, and the wire diameter is not large. When using the same line with large
electrical equipment, especially the electric
welding machine works on the same line, the electromagnetic heater will be affected by the
voltage drop of other
electrical equipmentDue to the lack of electrical knowledge of the staff, the 220V electromagnetic heater power supply is connected to the two live wires of the 380V four-wire three-phase
knife switch, causing accidents that the electromagnetic heater power supply is immediately damaged.
In addition, the line voltage drop also has a great influence on the power supply of the electromagnetic heater.
The third technical problem is that the heat dissipation effect of the aluminum radiator is not very ideal
When the applicant solved the third technical problem, he adopted a radiator made of pure
copper material, and the heat dissipation effect was very ideal. However, the manufacturing cost was very high, and the
gain outweighed the loss by adopting such a technical solution.