Water-repelling shotcrete anchor support method and water-repelling device for red sandstone layer
A spray anchor support and water isolation technology, which is applied in excavation, construction, infrastructure engineering, etc., can solve problems such as difficult to support the support surface, bulging shedding, cracks, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Such as figure 1 As shown, a water-proof device of a water-proof spray-bolt support method for a red sandstone layer includes a plastic cloth 1, the plastic cloth 1 is vertically installed on the rock mass wall between the piles of the support pile, and the plastic cloth 1 is externally fixed and installed Reinforcement skeleton 2, reinforcement skeleton 2 exterior fixedly installs straw curtain 3, straw curtain 3 exterior fixed installation reinforcement mesh sheet 4.
[0025] A water-proof shotcrete anchor support method for red sandstone layer, comprising the following steps:
[0026] a. After the construction of the supporting piles for the foundation pit, excavate the soil between the piles in vertical layers and horizontal sections. speed determination;
[0027] b. After excavating in vertical layers and horizontal sections, excavate the excavation surface again perpendicular to the foundation pit support surface to expose the pile body, and excavate the excavat...
Embodiment 2
[0031] Such as figure 1 As shown, a water-proof device of a water-proof spray-bolt support method for a red sandstone layer includes a plastic cloth 1, the plastic cloth 1 is vertically installed on the rock mass wall between the piles of the support pile, and the plastic cloth 1 is externally fixed and installed Reinforcement skeleton 2, reinforcement skeleton 2 exterior fixedly installs straw curtain 3, straw curtain 3 exterior fixed installation reinforcement mesh sheet 4.
[0032] A water-proof shotcrete anchor support method for red sandstone layer, comprising the following steps:
[0033] a. After the construction of the supporting piles for the foundation pit, excavate the soil between the piles in vertical layers and horizontal sections. On-site construction speed determination;
[0034] b. After excavating in vertical layers and horizontal sections, excavate the excavation surface again perpendicular to the foundation pit support surface to expose the pile body, and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com