Transmission determination method, device, base station, terminal, and computer-readable storage medium
A determination method, a technology of semi-static configuration, applied in the field of communication, which can solve problems such as time domain conflicts
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0071] see figure 1 as shown, figure 1 The transmission determination method provided in Embodiment 1 of the present disclosure includes:
[0072] S101: Determine whether to receive the first transmission according to the first information, and / or determine whether to send the second transmission according to the first information, so that the first transmission is received or the second transmission is sent at a moment.
[0073] It should be noted here that the first information in this embodiment includes at least one of the following information:
[0074] Whether the time domain resources of the first transmission overlap with the time domain resources of the second transmission;
[0075] The sequence relationship between the time-domain start resource of the first transmission and the time-domain start resource of the second transmission;
[0076] first indication signaling;
[0077] The size of the time domain resource by which the first transmission overlaps with the...
Embodiment 2
[0131] see figure 2 as shown, figure 2 The transmission determination method provided in Embodiment 1 of the present disclosure includes:
[0132] S201: Determine whether to send the first transmission according to the first information, and / or determine whether to receive the second transmission according to the first information, so that the first transmission is sent or the second transmission is received at a moment.
[0133] It should be noted here that the first information in this embodiment includes at least one of the following information:
[0134] Whether the time domain resources of the first transmission overlap with the time domain resources of the second transmission;
[0135] The sequence relationship between the time-domain start resource of the first transmission and the time-domain start resource of the second transmission;
[0136] first indication signaling;
[0137] The size of the time domain resource by which the first transmission overlaps with the...
Embodiment 3
[0189] In this embodiment, within the time unit when the semi-static frame structure configuration is Flexible (flexible) or the semi-static frame structure configuration is not received, the base station sends the PDCCH DCI to instruct the terminal to image 3 Downlink channels or signals are received in the B time units corresponding to the light black shaded boxes. The base station configures through high-level signaling to instruct the terminal, in image 3 The uplink channel or signal is sent in A time units corresponding to the white box.
[0190] N2 is the processing delay for the terminal to prepare for uplink transmission.
[0191] From image 3 It can be seen that the B time units when the terminal receives the downlink channel or signal overlaps in the time domain with the A time unit when the terminal sends the uplink channel or signal, and the time domain position of A arrives before B.
[0192] Because the downlink channel or signal transmission indicated by P...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


