Management method of infrastructure engineering construction management terminal

A technology for managing terminals and management methods, applied in the field of electric power applications, can solve problems such as common quality problems, standard processes, construction precautions, etc., and achieve the effects of improving construction efficiency, small size, and easy portability.

Pending Publication Date: 2020-02-14
FUSHUN POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER SUPPLY +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the problems existing in the above-mentioned prior art, the present invention provides a management method of infrastructure project construction management terminal, which solves problems such as common quality problems, standard processes, and construction precautions encountered in infrastructure project construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0018] Method of the present invention comprises the following steps:

[0019] Step 1: Include the company’s standard process and relevant building standards in the mobile terminal, and at the same time collect relevant precautions and requirements on acceptance and use proposed by power departments such as inspection, protection, communication, and measurement; for example: when inputting “current mutual inductance , click the "Search" button. At this time, the terminal will automatically select the items related to the root keyword for user reference.

[0020] Step 2, carry the mobile terminal to the construction site, and enter the keywords you want to query in the "search" column of the mobile terminal;

[0021] Step 3. According to the input keywords, the system will automatically display the relevant information. When you find the content you need to use, the system will display detailed construction precautions, construction points, and standard processes in the databa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a management method of a capital construction engineering construction management terminal, which mainly utilizes screening and searching functions and quick discrimination characteristics of electronic software to retrieve similar data from a terminal database and display the data in a terminal display screen. And then the detailed content is quickly accessed by utilizingthe quick link label, so that the required information is efficiently and quickly found out, the construction operation efficiency is improved, Meanwhile, a powerful support is provided for smooth construction of infrastructure projects. Meanwhile, the device is convenient to carry and charge and can be carried to a construction site for application at any time.

Description

technical field [0001] The invention relates to a management method for infrastructure project construction, in particular to a management method for a management terminal of infrastructure project construction, which belongs to the field of electric power application. Background technique [0002] "Standard technology" is the most important part of infrastructure projects, and must be strictly implemented during project construction. The level of project quality will directly affect the operation safety of power transmission and transformation equipment in the later stage, and is an important factor for the safe production of State Grid Corporation. The infrastructure project includes multiple links such as civil construction, primary electrical equipment installation, secondary equipment installation and commissioning, equipment acceptance and commissioning, and each link has detailed construction requirements. [0003] There are so many links in the infrastructure projec...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 吴耀为刘志勇柳德文杨石刘洪胜刘钢王磊张辉赵跃刘朝晖杨波刘强李大伟马鸿国鹿占锋施百川
Owner FUSHUN POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER SUPPLY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products