Method, system and equipment for constructing transformer substation graph model based on logic relationship
A logical relationship and substation technology, applied in electrical digital data processing, computer-aided design, design optimization/simulation, etc., can solve problems such as heavy workload, wiring diagram errors, manual drawing of wiring diagrams, etc., to improve work efficiency and avoid wrong effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] figure 1 It is a flowchart of the steps of a method for constructing a graph model of a substation based on a logical relationship according to an embodiment of the present invention.
[0049] Such as figure 1 As shown, the embodiment of the present invention provides a method for constructing a substation graph model based on a logical relationship, which includes the following steps:
[0050] S1. Build a panoramic database of substations;
[0051] S2. Standardize the output of the panoramic database to obtain the XML model file and SVG graphic file of the substation;
[0052] S3. The XML model file and the SVG graphic file are reviewed and verified by model checking and graphic verification. If the verification is passed, the document conforming to the IEC 61970 / 61968 power grid CIM model specification and the power grid SVG graphic expression specification will be obtained and the substation model will be established ;
[0053] Among them, the steps of constructing the panora...
Embodiment 2
[0077] Figure 4 It is a framework diagram of a substation graphics model system based on a logical relationship according to an embodiment of the present invention.
[0078] Such as Figure 4 As shown, the embodiment of the present invention also provides a construction of a substation graph model system based on a logical relationship, including a construction database unit 10, an output unit 20, and a verification unit 30:
[0079] Constructing a database unit 10 for constructing a panoramic database of the substation;
[0080] The output unit 20 is used for standardizing the output of the panoramic database to obtain the XML model file and the SVG graphic file of the substation;
[0081] The verification unit 30 is used for reviewing and verifying XML model files and SVG graphic files by using model testing and graphics verification. If the verification is passed, it will be in compliance with IEC 61970 / 61968 power grid CIM model specifications and power grid SVG graphic expressi...
Embodiment 3
[0091] The embodiment of the present invention provides a device including a processor and a memory;
[0092] The memory is used to store the program code and transmit the program code to the processor;
[0093] The processor is configured to execute the above-mentioned method for constructing a substation graph model based on a logical relationship according to the instructions in the program code.
[0094] It should be noted that the processor is configured to execute the steps in the above-mentioned embodiment of the method for constructing a graph model of a substation based on a logical relationship according to the instructions in the program code. Or, when the processor executes the computer program, the function of each module / unit in the foregoing system / device embodiments is realized.
[0095] Exemplarily, the computer program may be divided into one or more modules / units, and one or more modules / units are stored in a memory and executed by a processor to complete the applic...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com