Pilot tunnel chambering suspension cutting TBM for inclined shaft and construction method

A technology of inclined shaft and pilot tunnel, which is applied in earth-moving drilling, mining equipment, tunnels, etc., can solve the problem of low excavation efficiency of pilot tunnel of inclined shaft, improve the rock breaking efficiency and rock breaking specific energy, and improve the expansion and excavation. Efficiency, the effect of improving construction efficiency

Active Publication Date: 2021-02-09
CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF9 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Aiming at the deficiencies in the above-mentioned background technology, the present invention proposes a kind of pilot hole reaming suspension cutting TBM and construction method for inclined shafts, which solves the problem of low efficiency of inclined shaft pilot hole expansion and excavation in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pilot tunnel chambering suspension cutting TBM for inclined shaft and construction method
  • Pilot tunnel chambering suspension cutting TBM for inclined shaft and construction method
  • Pilot tunnel chambering suspension cutting TBM for inclined shaft and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 3

[0032] Embodiment 3: A construction method for a pilot hole reaming suspension cut TBM for an inclined shaft as described in Embodiment 2, the steps are as follows: S1: Align the pilot hole support shoe 101 with the pilot hole 200 and tighten it in the pilot hole On the inner wall, when the TBM excavates through rock, the cutter head 102 for hanging cutting and expanding excavation rotates, and the hanging cutter on the cutter head 102 for cutting and expanding cuts the face of the tunnel face. Before TBM rock-breaking excavation, according to the tunnel diameter that needs to be expanded, adjust the position of cutter beam 201 on the spoke structure 202 through radial cylinder 203 to form an excavation profile that meets the requirements; The face of the tunnel is cut layer by layer to form a hanging cutting excavation; the dregs generated during the excavation process enter the pilot tunnel under the action of the hanging cutting hob 205 inclined on the hanging cutting expans...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pilot tunnel chambering suspension cutting TBM for an inclined shaft and a construction method. The problem that in the prior art, the inclined shaft pilot tunnel chamberingsuspension cutting efficiency is low is solved. The pilot tunnel chambering suspension cutting TBM for the inclined shaft comprises a central main beam and a suspended-cutting and expanded-excavatingcutter head, the front end of the central main beam penetrates through the center of the suspended-cutting and expanded-excavating cutter head and is provided with a pilot tunnel supporting shoe, thepart, located behind the suspended-cutting and expanded-excavating cutter head, of the central main beam is connected with a propelling system, a driving supporting shoe device and a safety supportingshoe device, and the tail part of the safety supporting shoe device is connected with a rear matching sleeve. According to the pilot tunnel chambering suspension cutting TBM for the inclined shaft and the construction method, aiming at pilot tunnel expanding excavation from top to bottom, the suspended-cutting and expanded-excavating cutter head is adopted for conducting suspended cutting excavation layer by layer on a rock stratum around a pilot tunnel, the cutting and expanding excavation efficiency is improved, the suspended-cutting and expanded-excavating cutter head changes the traditional TBM hob rolling rock breaking principle, the characteristic that the rock shearing strength is far smaller than the uniaxial compressive strength and free face rock breaking is utilized, a suspended cutting hob is adopted for rock breaking, and the rock breaking efficiency and the rock breaking specific energy are improved.

Description

technical field [0001] The invention relates to the technical field of inclined shaft construction, in particular to a pilot hole reaming suspension cutting TBM for inclined shafts and a construction method. Background technique [0002] The traditional raise drilling rig method is mostly used in the construction of large-slope inclined wells in China. The excavation of the inclined shaft section with large diameter (>7 meters) is divided into three steps: 1. Drilling a pilot hole with a diameter of about 200 mm; A pilot hole with a diameter of about 3 meters is excavated by means of a disk; 3. Radially drill holes in the pilot hole, and excavate to a set diameter by drilling and blasting. The main problem of the traditional raising drilling method lies in the third step. The blasting operation in long inclined shafts has great potential safety hazards. At the same time, the drilling and blasting operation has a large disturbance to the surrounding rock, and the quality ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/02E21D9/08
CPCE21D9/02E21D9/08E21D9/065
Inventor 贾连辉于庆增宁向可张啸刘建峰
Owner CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products