A refined water storage test method for construction roadways of underground water-sealed caverns

A technology for construction roadway and water storage test, applied in geophysical measurement, instruments, measuring devices, etc., can solve the problems of prolonging the construction period, failing to find the grouting area in time, increasing costs, etc., to ensure accuracy, save financial resources, shorten The effect of duration

Active Publication Date: 2021-10-22
HENAN UNIVERSITY
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The technical problem to be solved by the present invention is to overcome the defects that the grouting area cannot be found in time during the water storage process of the construction roadway of the underground water-sealed cavern in the prior art, which increases the cost and prolongs the construction period, and provides an underground water-sealed cavern Refined water storage test method for construction roadway

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A refined water storage test method for construction roadways of underground water-sealed caverns

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0026] An underground water-sealed cavern construction roadway refined water storage test method, comprising the following steps:

[0027] S1. Determine the vertical height H of water storage in a single experimental section 1 and the equivalent seepage constant S under the condition of no impoundment 0

[0028] The equivalent seepage constant under the ideal working conditions and operating conditions without impoundment is S 0 ,

[0029] Order S 0 =Q(0) / (Hw-H 0 )

[0030] Among them, Q(0) is the water consumption of the main cavern before water storage in the construction roadway, Hw is the central elevation of the section of the water curtain system, H 0 The central elevation of the main chamber section;

[0031] According to the water storage level H of the construction roadway in the final state op , combined with the elevation of the concrete plug and the number of proposed tests n to determine the vertical height H of the water storage for a single test 1 , H ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a refined water storage test method for underground water-sealed cavern construction roadway, including S1, determining the vertical height H1 of water storage in a single test section and S in the state of no water storage 0 ; S2, carry out the test according to each parameter determined in the preparation stage and record the value of water inflow at the beginning and end of each test section, the equivalent seepage constant of any a test section is Sa, compare S a and S 0 size; if S a >S 0 , and then calculate ΔS / S 0 , and then perform grouting treatment on the area that needs to be grouted in the test section; if S a with S 0 If they are basically equal, the next test segment can be detected directly. The refined water storage test method of the construction roadway of the underground water-sealed cavern of the present invention performs scientific and refined management on the water storage stage of the construction roadway, and can identify the construction roadway and the main cavern during the water storage process without adding additional procedures In order to shorten the construction period as much as possible and save financial resources, we adopt the method of monitoring and treatment at the same time.

Description

technical field [0001] The invention relates to a refined water storage test method for construction roadways of underground water-sealed caverns. Background technique [0002] Underground water-sealed caverns have the advantages of safety, environmental protection, environmental friendliness, and low cost, and are currently being vigorously promoted in my country as an oil storage method. Before the underground water-sealed cavern enters the oil storage state, it is necessary to store water to a certain height in the construction roadway to ensure the airtightness of the cavern. [0003] Underground water-sealed caverns are often built in hard rock mass. The cracks in the rock mass are very complex, and there may be seepage channels between the construction roadway and the main cavern. If there are seepage channels, on the one hand, it will increase the water inflow in the cavern, resulting in an increase in operating costs; on the other hand, it will affect the long-term ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G01M3/02G01V3/00
CPCG01M3/02G01V3/00
Inventor 石磊张彬张建伟彭振华李俊彦边汉亮
Owner HENAN UNIVERSITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products