Runoff calculation and prediction method based on watershed hydrological model
A technology of hydrological models and prediction methods, applied in prediction, calculation, instruments, etc., can solve the problems of complex calculation process and slow model response, and achieve the effects of wide application range, high model accuracy and fast calculation speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0051] The technical solutions of the present invention will be further described below through specific examples.
[0052] A method for calculating and predicting runoff based on a watershed hydrological model is carried out according to the following steps:
[0053] Step 1, establish the basic watershed database;
[0054] This case selects the Songhua River Basin in Northeast my country as a case study. The DEM elevation data of the Songhua River Basin are as follows: figure 2 As shown, the land use data and river network distribution are as follows image 3 As shown, the distribution of monitoring stations for meteorological data (rainfall and temperature) is as follows Figure 5 shown.
[0055] Step 2, dividing the hydrological response unit;
[0056] After establishing the basic watershed database, first use the DEM elevation data to generate the river network of the watershed, and define the total outlet of the watershed; then divide the sub-basin according to the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com