A construction method and deep foundation technology, applied in infrastructure engineering, excavation, artificial islands, etc., can solve the problems of occupying basement area, small reserved space, insufficient construction space, etc., to increase the usable area and reserve space. Reduce and reduce the effect of earthwork excavation and transportation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] The construction method of deep foundation narrow outer enclosure space includes the following steps:
[0032] S1. Drive concrete slope protection piles 7, excavate the foundation pit and use the soil nail wall process to protect the slope, pour the concrete foundation cushion, and do the cushion waterproof treatment;
[0033] S2. Set up the keel frame, prefabricated cement formwork, the keel frame is square, and is composed of vertical keel 1, sky keel 2 and ground keel 3, the sky keel 2 and ground keel 3 are riveted to the upper and lower ends of vertical keel 1 respectively, pre-installed The good keel frame is placed upright on the concrete cushion at the bottom of the foundation pit and fixed with the concrete cushion by anchors. A distance of 250 mm is reserved between the keel frame and the side slope of the foundation pit. The vertical keel 1 passes through the reinforced keel 4 and the concrete slope protection pile 7 connection, install the additional keel 8 a...
Embodiment 2
[0040] The construction method for the narrow outer enclosure space of the foundation includes the following steps:
[0041] S1. Drive concrete slope protection piles 7, excavate the foundation pit and use the soil nail wall process to protect the slope, pour the concrete foundation cushion, and do the cushion waterproof treatment;
[0042]S2. Set the keel frame, prefabricated galvanized mesh formwork, the keel frame is square, and is composed of vertical keel 1, sky keel 2 and ground keel 3, and sky keel 2 and ground keel 3 are riveted to the upper and lower ends of vertical keel 1 respectively, The pre-installed keel frame is placed upright on the concrete cushion at the bottom of the foundation pit and fixed with the concrete cushion by anchors. A distance of 300 mm is reserved between the keel frame and the slope of the foundation pit. The vertical keel 1 is connected to the concrete through the reinforced keel 4. The slope protection pile 7 is connected, and the additiona...
Embodiment 3
[0048] The construction method for the narrow outer enclosure space of the foundation includes the following steps:
[0049] S1. Drive concrete slope protection piles 7, excavate the foundation pit and use the soil nail wall process to protect the slope, pour the concrete foundation cushion, and do the cushion waterproof treatment;
[0050] S2. Set up the keel frame, prefabricated cement formwork, the keel frame is square, and is composed of vertical keel 1, sky keel 2 and ground keel 3, the sky keel 2 and ground keel 3 are riveted to the upper and lower ends of vertical keel 1 respectively, pre-installed The good keel frame is placed upright on the concrete cushion at the bottom of the foundation pit and fixed with the concrete cushion by anchors. A distance of 350 mm is reserved between the keel frame and the side slope of the foundation pit. The vertical keel 1 passes through the reinforced keel 4 and the concrete slope protection pile 7 connection, install the additional k...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com