Load scheduling method and device for energy storage equipment, equipment and storage medium
A technology for energy storage equipment and load scheduling, applied in circuit devices, AC network load balancing, AC network voltage adjustment, etc. , Improve safety and stability, the effect of stable output power
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] figure 1 It is a flow chart of a load scheduling method for energy storage equipment provided by Embodiment 1 of the present invention. This embodiment is applicable to the case of load scheduling for energy storage equipment. This method can be implemented by the energy storage equipment in the embodiment of the present invention. load dispatching device, which can be integrated in the dispatching equipment and realized by software and / or hardware, such as figure 1 As shown, the method specifically includes the following steps:
[0051] S110. Obtain the load dispatching demand of the power grid and the dispatching application information sent by the registered energy storage device.
[0052]Among them, the grid load scheduling demand refers to the demand for electric load in the current grid, which can be determined according to the power generation of all power supply sources in the current grid and the sum of the expected power consumption of all electrical equipmen...
Embodiment 2
[0073] figure 2 It is a flow chart of a load scheduling method for an energy storage device in Embodiment 2 of the present invention. This embodiment is optimized based on the above embodiment. In this embodiment, after obtaining the dispatching application sent by each registered energy storage device Before the information, it also includes: obtaining the communication application initiated by the registered energy storage device after power-on, the communication application carrying the identity information of the corresponding registered energy storage device; reviewing the communication application; if the communication application is reviewed If passed, the communication permission information is fed back to the registered energy storage device.
[0074] Such as figure 2 As shown, the method of this embodiment specifically includes the following steps:
[0075] S210. Obtain a communication application initiated by the registered energy storage device after power-on, ...
Embodiment 3
[0095] image 3 It is a flow chart of a load scheduling method for an energy storage device provided by Embodiment 3 of the present invention. This embodiment is applicable to the load scheduling of an energy storage device. This method can be implemented by the energy storage device in the embodiment of the present invention. load scheduling device, which can be integrated in the energy storage equipment, implemented by software and / or hardware, such as image 3 As shown, the method specifically includes the following steps:
[0096] S310. Send dispatching application information to the dispatching device, so that the dispatching device determines a dispatching instruction corresponding to the dispatching application information according to the dispatching application information and the load dispatching demand of the power grid.
[0097] Wherein, the scheduling application information may be charging application information or discharging application information, or, the s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com