Building structure and installing method for two-layer movable panel house
A technology for building structures and prefabricated houses, which is applied in residential buildings, building structures, buildings, etc., can solve the problems of poor wind resistance and earthquake resistance, large material loss of building prefabricated houses, and low reuse rate. Strong wind and earthquake resistance, optimized quality and economic benefits, and labor-saving effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0016] Example 1. All components of the building structure of the two-story movable board house of the present invention are manufactured, processed, and constructed by using a common standard modulus, and all steel structural components are assembled by bolt connection. The general standard modulus of the components of the two-story movable board building structure is based on the center axis distance between the adjacent corner pillars (2) and the pillars (3), or between the pillars (3) and the pillars (3). Unit, representing the symbol "K", 1K = 1.82 meters. 1K is also equal to the length of a sandwich panel (7). The building structure of the two-story prefabricated house usually takes "2K" as a standard bay, and it can be assembled in any number of units "K" in the longitudinal direction. The span of the two-story movable board building structure is also based on "K", and the maximum span can be made with five units of "K". However, the drawings of this embodiment illustrate f...
Example Embodiment
[0017] Example 2. The steps of the actual construction method of the two-story movable board house structure of the present invention are:
[0018] 1. Connect the four ground beams (1) with right-angle bolts to form a rectangular ground beam (1) frame, and fix the ground beam (1) frame on the ground;
[0019] 2. Connect the four corner columns (2) with vertical bolts at the four right-angle positions of the ground beam (1) frame;
[0020] 3. Connect several uprights (3) with vertical bolts on the ground beam (1) frame according to the length of 1K (1.82 meters) respectively;
[0021] 4. Connect each joist (5) with the opposite corner column (2) or column (3) at right angles with bolts, and weld several purlin seats and several purlins (6) on each joist (5). ) The purlin seat is bolted to the joist (5) at right angles.
[0022] 5. Connect the four ring beams (4) with right-angle bolts to form a rectangular ring beam (4) frame;
[0023] 6. Connect the rectangular ring beam (4) frame...
PUM
Property | Measurement | Unit |
---|---|---|
Length dimension | aaaaa | aaaaa |
Height | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap