Method for checking out phase handling unit (PHU) in site

A field calibration and phasor measurement technology, applied in the direction of measurement device, measurement of electricity, measurement of electric variables, etc., can solve problems affecting technical evaluation, completion acceptance and operation and maintenance, lack, and determination of measurement accuracy, etc.

Inactive Publication Date: 2006-04-19
上海瑞浩信息技术有限公司 +1
View PDF0 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The phasor data of the power grid changes rapidly with time. Traditional calibration devices or AC sampling transmitters cannot provide dynamic phasor data, but can only provide steady-state amplitude data of the power grid.
For a long time, a large number of PMU field performance tests only test its amplitude accuracy, and other indicators can only be carried out under relatively good laboratory conditions, especially for the key satellite time synchronization accuracy, internal potential power angle of the unit and line phasor, Communication protocols and transmission performance lack direct testing methods. Generally, after the system is connected to the network, the correctness of the phase angle measurement is roughly checked by the master station, so it can only be qualitatively determined, and quantitative error analysis cannot be performed. A large amount of power grid dynamic data collected by a large PMU makes it difficult to determine the measurement accuracy and identify out-of-tolerance data according to technical standards, which seriously affects technical evaluation, completion acceptance and operation and maintenance

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for checking out phase handling unit (PHU) in site
  • Method for checking out phase handling unit (PHU) in site
  • Method for checking out phase handling unit (PHU) in site

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] Accompanying drawing discloses the information exchange schematic diagram between the PC of tested PMU device of the present invention, PMU tester and simulation master station; The PC of simulation master station communication software is equipped with, receives measured PMU device and PMU simultaneously The real-time phasor data of the tester; time synchronization sorting is carried out according to the GPS time scale carried by the respective data messages, and then the error comparison and root mean square error calculate.

[0014] The error analysis uses the absolute maximum error, root mean square error, and random error distribution:

[0015] Maximum absolute error: err max =MAX(|x i -x i |)

[0016] root mean square error:

[0017] err sqrt = Σ i = 1 N ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The method is in use for checkout on site by using synchronous phase measuring unit (PMU). Arrangement and steps of the method are as following: one PMU tester and one PC with communication software for simulating main station are utilized; PMU device to be measured and PMU tester are connected to same AC signal source; PMU device and PMU tester receive own GPS satellite clock synchronization signal respectively; through data LAN, PC receives data of real phase of PMU device and PMU tester; time synchronism sorting is carried out according to GPS timing mark carried by own data message for data of real phase from PMU device and PMU tester; then, error comparison and root-mean-square error calculation are carried out for two sets of data at same time within a period of time; finally, root-mean-square error and confidence interval of error are obtained.

Description

technical field [0001] The invention discloses a method for on-site calibration of a phasor measuring device (PMU). The method adopts error analysis of synchronous comparison between the measured data of the measured PMU and the standard measured data of the PMU tester. The invention is mainly applied to the engineering construction of a wide area measurement system (WAMS), and belongs to the field of power systems and automation thereof. Background technique [0002] In order to ensure the safe and stable operation of regional power grids, major power grids at home and abroad have accelerated the application of wide area measurement systems (WAMS) and phasor measurement units (PMU), and installed PMU devices in some hub substations and large power plants for synchrophasor measurement. The dynamic phasor information is transmitted to the WAMS main station system, and the WAMS main station implements dynamic and stable monitoring of the power grid according to the measurement...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01R31/00
Inventor 潘勇伟徐晨亮王洪青奚国富
Owner 上海瑞浩信息技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products