Three dimension uniform model construction method of water conservancy hydropower engineering geological information
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- TIANJIN UNIV
- Publication Date
- 2006-11-08
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a construction method of a three-dimensional engineering geological model, in particular to a construction and analysis method for realizing a three-dimensional unified model of water conservancy and hydropower engineering geology by coupling multi-source data. Background technique
[0002] Most of the water conservancy and hydropower projects are operated under the conditions of mountains and valleys. Due to the harsh geological conditions, complex geological structures, and numerous geological information, it has brought great difficulties to engineering geological surveys, hub layout and design, and underground engineering construction management. In all stages of geological survey and exploration of water conservancy and hydropower projects, it is necessary to obtain various geological information, including surface topography, stratum interface, fault, groundwater level, weathered layer thickness distribution, geophysical a...