Apparatus for reducing windage loss of steam turbines
a technology of wind turbines and accessories, which is applied in the direction of steam engine plants, steam accumulators, machines/engines, etc., can solve the problems of reducing the operation of steam turbines and causing damage to buckets, and achieve the effect of reducing or preventing windage loss of steam turbines and reducing or minimizing damage to last-stage buckets
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
second embodiment
[0076]An apparatus for reducing or preventing windage loss of steam turbines according to the present disclosure will be described with reference to the drawings.
[0077]Referring to FIGS. 6 to 8, an apparatus for reducing or preventing windage loss of steam turbines according to a second embodiment of the present disclosure includes a turbine unit 100 including a high-pressure turbine 110, a medium-pressure turbine 120, and a low-pressure turbine 130, a condenser 200 in which steam passing through the low-pressure turbine 130 is supplied and heat-exchanged, a tank unit 300 in which steam generated at the time of operation of the turbine unit 100 is converted into condensed water after being condensed, and stored, a steam supplier 4000 supplying additional steam to an inlet stage 111 and an outlet stage 112 of the high-pressure turbine 110 to minimize a rapid rise in temperature at the outlet stage 112 of the high-pressure turbine 110 due to speed-up of the medium-pressure turbine 120...
first embodiment
[0081]Since main configurations of the present embodiment are similar to those of the aforementioned first embodiment, the steam supplier 4000 having different configuration will be mainly described.
[0082]The steam supplier 4000 supplies additional steam to the inlet stage 111 of the high-pressure turbine 110 to minimize a rapid rise in temperature at the outlet stage 112 of the high-pressure turbine 110 due to speed-up of the medium-pressure turbine 120 under a condition that the condenser 200 is not operated.
[0083]The steam supplier 400 includes a first extension pipe 4100 extending toward between a second-stage turbine and a third-stage turbine among the turbines configuring the high-pressure turbine 110, a third extension pipe 4200 extending toward the last stage of the high-pressure turbine 110, and a steam generator 4300 supplying steam to the first and third extension pipes 4100 and 4200.
[0084]The first and third extension pipes 4100 and 4200 are pipes or tubes having a gener...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


