Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

31results about How to "Reduce void ratio" patented technology

High-efficiency curing method for soft soil site with high moisture content

ActiveCN109763480AEfficient reinforcementReduce inputSoil preservationSoil scienceCement slurry
The invention belongs to the technical field of environment rock-soil engineering and discloses a high-efficiency curing method for a soft soil site with high moisture content. The high-efficiency curing method comprises an in situ chemical curing step and a preloading drainage step; the in situ chemical curing step comprises investigating sites, determining physical and chemical indexes such as depth, area, moisture content, organic matter content, liquid plastic limit and salt content of the soft soil site; blending a curing agent, determining the types, adding ratio, and initial and final setting time of the curing agent based on the physical and chemical indexes; blocking the site, and building partition walls for site blocking in the soft soil site; carrying out chemical curing construction, and uniformly mixing the blended curing agent with to-be-cured soft soil; carrying out preloading drainage construction according to three construction modes of vacuum preloading or surchargepreloading or vacuum surcharge preloading; unloading and repairing the site; after preloading time reaches 28 days, swabbing off drained water from the upper surface layer of curing blocks, unloadingand injecting cement slurry into a drain board for secondary repair and reinforcement by adopting a high-pressure grouting pump.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI

Saline soil area combined drain system and combined water drain forced ramming foundation treating method thereof

InactiveCN101349052AImprove foundation bearing capacity and modulusSave ground treatment costsSoil preservationProcess regionEngineering
The invention relates to a combined drainage system in a saline oil region and a method for processing the combined drainage and strongly tamping foundation. The method comprises the following steps: firstly, the combined drainage system for dredging and discharging groundwater is arranged in the foundation soil of a treatment region; the combined drainage system comprises a drainage passage combined by plastic drainage strips and dinas drainage piles; each plastic drainage strip and each dinas drainage pile are covered and a construction and operation surface layer is paved on the surface of the treatment region; the strongly tamping is carried out on the construction and operation surface layer by a tamping hammer; a tamping pit is formed in each dynamic tamping position; after groundwater in the foundation is collected in the tamping pits, pumped and discharged to the outside of a construction field; and the tamping pits are backfilled and leveled, thereby completing the first point tamping. The combined drainage system and the method solve the problem of discharging groundwater, substantially improve the bearing capacity of the foundation and the modulus, meet the requirements of constructing various buildings in the saline oil region, can save the expenses of foundation treatment by over 40 percent and shorten the construction period of the foundation treatment by more than one half.
Owner:JIAN YAN FOUND ENG

Dynamic compaction treatment method of deep foundation displacement

The invention relates to a construction method of a building foundation treatment technology, in particular to a dynamic compaction treatment method of deep foundation displacement. The method comprises two construction schemes, the first construction scheme adopts a method that sand-gravel pile construction is conducted first, and then dynamic compaction is conducted, pores are formed through a vibration pipe sinking method, piles are formed by stuffing, and local compaction is conducted on soil between the piles; the second construction scheme adopts a method that the dynamic compaction is conducted first, and then the sand-gravel pile construction is conducted, full compaction is conducted on a field, the pores are formed through the vibration pipe sinking method, and the piles are formed by the stuffing. According to the dynamic compaction treatment method of the deep foundation displacement, the advantages of the vibration pipe sinking sand-gravel pile method and the dynamic compaction method on treating soft foundations are combined, and the part displacement of the soft foundations and the dual compaction effects of the dynamic compaction and the vibration are achieved. The dynamic compaction treatment method of the deep foundation displacement has the advantages of being good in treatment effect, low in treatment cost, economical, reasonable and capable of saving resources.
Owner:山东建勘集团有限公司

A method for improving in-service tailings pond capacity and a device thereof

The present invention discloses a method for improving an in-service tailings pond capacity and a device thereof, belonging to a field of tailings pond expansion technology. The method and the device are realized through a three-step tailings pond processing: a step of installing a working cushion for a tailings pond with a designed pond capacity and constructing a drainage system for drainage consolidation; a step of increasing the dam body height, discharging new tailings mud into the pond, and installing the working cushion and constructing a drainage system for a second time when the mud reaches the newly-increased dam body height; a last step of conducting consolidation processing on the newly-discharged tailings mud and storing the mud in different areas and on different layers via a paving system. The method for improving the in-service tailings pond capacity and the device thereof substantially reduce horizontal acting force of original tailings mud on an original tailings dam while a saturation line of the tailings dam body is lowered, with safety of the tailing pond improved, void ratio of a tailings soil mass greatly reduced, and the capacity of the tailings tank enhanced. Therefore the service life of the tailings pond is prolonged. The construction device of improving in-service tailings pond capacity has characteristics of easy operation, flexible combination, quick operation, and succinct and efficient construction technology.
Owner:BEIHANG UNIV

Sludge dewatering concentration and consolidation treatment method

The invention relates to an environment-friendly and efficient method for dewatering consolidation of sludge in the urban waters and sewage treatment plants, belonging to the technical field of sludge dewatering processes. The method comprises the following steps: adding a certain amount of lime milk into the sludge to be treated, wherein the addition is generally 0.1-1wt%; adding the liquid obtained by mixing sodium silicate and sulfuric acid through a high-speed stirrer, wherein the addition is 0.01-0.5wt%; stirring for about 2-10 minutes, blowing in air or carbon dioxide to reduce the pH value to 7.5-8.5; and putting the slurry into a sedimentation tank or air flotation tank for separation. Through a series of water absorption, hydrolysis and hydration reactions, an irreversible condensation hardened shell is formed, and the sludge particles have certain water stability and strength stability. After that, generally 5-10wt% of the mixture of cement, lime and fly ash is added so that the sludge is internally dense; and after being hardened, the sludge has certain structural strength. Through the water absorption effect of the solidified material after two-step treatment, the moisture content of the sludge can be effectively reduced, and certain 'pollution reduction' and 'strengthening and solidifying' effects are realized.
Owner:TIANJIN POLYTECHNIC UNIV

Saline soil area combined drain system and forced ramming foundation treating method thereof

The invention relates to a combined drainage system in a saline oil region and a method for treating the strongly tamping foundation. The method comprises the following steps: firstly, plastic drainage strips are constructed in a treatment region, then a dinas drainage undercourse is paved on the position of the surface of the treatment region coated with each drainage strip; the plastic drainage strips and the dinas drainage undercourses are combined to form a passage for dredging and discharging groundwater; points are distributed on the dinas drainage undercourses and strongly tamped by a tamping hammer; a tamping pit is formed in each strongly tamping position; after the groundwater in the foundation flows into each plastic drainage strip, flows to the dinas drainage undercourse by the plastic drainage strips and are collected in the tamping pits by the dinas drainage undercourses; the groundwater collected in the tamping pits is pumped and discharged to the outside of a construction field; and finally, the tamping pits are backfilled and leveled. The combined system and the method can substantially improve the bearing capacity of the foundation and the modulus, meet the requirements of constructing various buildings in the saline oil region, save the expenses of foundation treatment and shorten the construction period of the foundation treatment.
Owner:JIAN YAN FOUND ENG

Multi-vibroflot resonance ground treatment equipment and method

ActiveCN103215944BSignificant compaction and reinforcement effectImprove bearing capacitySoil preservationResonanceArchitectural engineering
The invention discloses multi-vibroflot resonance ground treatment equipment and a multi-vibroflot resonance ground treatment method, and relates to the technical field of sandy soil ground treatment. The equipment comprises an equipment main body, a cantilever, a suspension cable component, channel steel, at least two steel ropes and vibration devices in a number which corresponds to that of the steel ropes, wherein the equipment main body is connected with the suspension cable component through the cantilever; the suspension cable component is fixedly connected with the middle position of the channel steel; the two sides of the channel steel are connected with the at least two uniformly distributed steel ropes; the lower parts of the steel ropes are fixedly connected with the corresponding vibration devices; the vibration devices are vibroflots in which skewed rotors driven by motors are arranged, and are provided with water inlets which are connected with a high-pressure water pump; and a buffering vibration-proof gasket is arranged between each vibration device and the corresponding steel rope. The construction method is simple, the equipment and the method are rational in design, convenient to implement, low in construction cost and high in working efficiency, can be effectively applied to a sandy soil ground treatment process, and have good treatment effects, and the construction quality is easily ensured.
Owner:SHANGHAI HARBOUR SOFT SOIL TREATMENT ENG CO LTD +1

Device and method for reinforcing soft soil foundation through combination of strong drainage preloading and electroosmosis

The invention discloses a device and method for reinforcing a soft soil foundation through combination of strong drainage preloading and electroosmosis, and relates to the technical field of soft soil foundation reinforcing engineering. The device for reinforcing the soft soil foundation through the combination of strong drainage preloading and electroosmosis comprises at least one drainage assembly, the drainage assembly comprises at least one strong drainage plate and an electroosmosis unit, the strong drainage plate is coated with a filter membrane, a drainage channel is formed between the strong drainage plate and the filter membrane, the strong drainage plate is connected with a Venturi tube, and the interior of the Venturi tube is hollow to form a jet flow inner cavity of which the front and back are correspondingly connected with a fluid inlet and a fluid outlet; and the electroosmosis unit comprises an anode and a cathode which are matched for use, the anode is a steel bar inserted into the soft soil foundation, the cathode is an electrode arranged in the drainage channel, and the electrode and the steel bar are matched to enable pore water with positive charges to permeate the filtering membrane and flow into the drainage channel. The soft soil foundation can be reinforced, the consolidation effect of the deep layer part and the shallow layer part is further improved, and the void ratio of the soil body is reduced.
Owner:GUANGZHOU SHENGZHOU FOUND ENG

Foam aluminum pole piece coating equipment and pole piece production method using the same

The present application provides foamed aluminum pole piece coating equipment and a pole piece production method using the same. The foamed aluminum pole piece coating equipment includes: a slurry pool, including a squeeze roller, the slurry pool is formed with a first cavity, the squeeze roll is arranged in the first cavity containing the slurry, and the squeeze roll includes a roller The blade and the blade connected to the roller are formed by protruding toward the outside of the roller, and the squeeze roller is used to guide the slurry to the aluminum foam pole piece by rotating the blade; the scraper mechanism includes the first scraper and the second scraper arranged at intervals Two scrapers, the first scraper and the second scraper are equipped with a comb-like tooth structure, the comb-like tooth structure is used to scrape off part of the slurry on the surface of the foamed aluminum; the driving mechanism is located on the scraper mechanism away from the slurry pool One side is used to drive the displacement of the aluminum foam pole piece relative to the scraper mechanism and the slurry pool. The foamed aluminum pole piece coating equipment can ensure that the slurry in the foamed aluminum is filled densely, and can also realize functions such as automatic coating, scraping off excess slurry, standing to dry, and accurately controlling the thickness of the pole piece.
Owner:ZHONGTIAN SUPERCAPACITOR TECH CO LTD +1

Preparation method of full-body granite ceramic tile

The invention belongs to the field of ceramic tiles, relates to a preparation method of a full-body granite ceramic tile and aims to solve the problems of non-uniform coloring, long production periodand high production cost of an existing full-body granite ceramic tile. The following technical schemes are adopted: the preparation method comprises the following steps that: S1, raw materials are crushed and ball-milled, the crushed and ball-milled material is sieved, and iron is removed, so that slurry A is prepared; S2, the slurry A in the S1 is subjected to powder formation, pressing and pre-drying, so that a brick blank B can be obtained; S3, the brick blank B in the S2 is sequentially subjected to ground coat spraying, protective glaze spraying, pattern spraying and dry granular glaze spraying treatment to obtain a brick blank C, the caliber of dry granular glaze spraying nozzles is 2.8-3.0 mm, each nozzle is of a spiral structure, the multiple nozzles are connected with the same glaze suction pipe, and a quarter ball valve is installed on the glaze suction pipe; and S4, the brick blank C in the S3 is subjected to material throwing and drying, the treated brick blank C is put into a firing kiln so as to be fired and molded, so that a sample D can be obtained; and S5, the sample D in the S4is processed, inspected and classified. The full-body granite ceramic tile is uniform in coloring, short in production period and low in production cost.
Owner:广东强辉陶瓷有限公司

Foamed aluminum pole piece coating equipment and pole piece manufacturing method applying same

The invention provides foamed aluminum pole piece coating equipment and a pole piece manufacturing method applying same. The foamed aluminum pole piece coating equipment comprises a slurry pool, the slurry pool comprising an extrusion roller, a first cavity being formed in the slurry pool, the extrusion roller being arranged in the first cavity containing slurry, the extrusion roller comprising a roller and blades connected with the roller, the blades protruding towards the outer side of the roller, and the extrusion roller being used for enabling the blades to guide the slurry to a foamed aluminum pole piece through rotation; a scraping plate mechanism, comprising a first scraping plate and a second scraping plate which are arranged at an interval, comb-shaped tooth structures being arranged on the first scraping plate and the second scraping plate, and the comb-shaped tooth structures being used for scraping part of slurry on the surface of the foamed aluminum; a driving mechanism, arranged on the side, away from the slurry pool, of the scraper mechanism and used for driving the foamed aluminum pole piece to move relative to the scraper mechanism and the slurry pool. The foamed aluminum pole piece coating equipment can ensure that slurry in foamed aluminum is filled compactly, and can also achieve the effects of automatic coating, redundant slurry scraping, standing for drying, accurate pole piece thickness control and the like.
Owner:ZHONGTIAN SUPERCAPACITOR TECH CO LTD +1

Inverted filter material water permeable pile composite foundation and water permeable rate measuring device and method thereof

The invention discloses an inverted filter material water permeable pile composite foundation and a water permeable rate measuring device and method thereof. The composite foundation comprises recycled concrete water permeable piles, prestressed concrete piles, geotextile wrapping the recycled concrete water permeable piles and a mattress layer laid at the tops of the water permeable piles. The measuring device comprises a sleeve, an inner support arranged in the sleeve, a pervious concrete test piece arranged on the inner support and geotextile wrapping a water permeable concrete test piece.Waste concrete is recycled to be made into recycled concrete, the recycled concrete is combined with the geotextile, resources are saved, meanwhile, the foundation has good water permeability, water can be drained to the maximum extent, sandy soil is reserved, piping and quicksand caused by hydraulic power are prevented, the bearing capacity of the foundation is improved, and sedimentation of a building is reduced; the corresponding water permeable rate testing device is simple in structure, the testing method is convenient to use, and the water permeable performance of the water permeable concrete and the impermeability of a concrete test block can be rapidly detected.
Owner:NANCHANG UNIV

A method for improving in-service tailings pond capacity and a device thereof

The present invention discloses a method for improving an in-service tailings pond capacity and a device thereof, belonging to a field of tailings pond expansion technology. The method and the device are realized through a three-step tailings pond processing: a step of installing a working cushion for a tailings pond with a designed pond capacity and constructing a drainage system for drainage consolidation; a step of increasing the dam body height, discharging new tailings mud into the pond, and installing the working cushion and constructing a drainage system for a second time when the mud reaches the newly-increased dam body height; a last step of conducting consolidation processing on the newly-discharged tailings mud and storing the mud in different areas and on different layers via a paving system. The method for improving the in-service tailings pond capacity and the device thereof substantially reduce horizontal acting force of original tailings mud on an original tailings dam while a saturation line of the tailings dam body is lowered, with safety of the tailing pond improved, void ratio of a tailings soil mass greatly reduced, and the capacity of the tailings tank enhanced. Therefore the service life of the tailings pond is prolonged. The construction device of improving in-service tailings pond capacity has characteristics of easy operation, flexible combination, quick operation, and succinct and efficient construction technology.
Owner:BEIHANG UNIV

Saline soil area combined drain system and forced ramming foundation treating method thereof

ActiveCN101349051BAvoid crowdingSave construction and development fundsSoil preservationProcess regionEngineering
The invention relates to a combined drainage system in a saline oil region and a method for treating the strongly tamping foundation. The method comprises the following steps: firstly, plastic drainage strips are constructed in a treatment region, then a dinas drainage undercourse is paved on the position of the surface of the treatment region coated with each drainage strip; the plastic drainagestrips and the dinas drainage undercourses are combined to form a passage for dredging and discharging groundwater; points are distributed on the dinas drainage undercourses and strongly tamped by a tamping hammer; a tamping pit is formed in each strongly tamping position; after the groundwater in the foundation flows into each plastic drainage strip, flows to the dinas drainage undercourse by theplastic drainage strips and are collected in the tamping pits by the dinas drainage undercourses; the groundwater collected in the tamping pits is pumped and discharged to the outside of a construction field; and finally, the tamping pits are backfilled and leveled. The combined system and the method can substantially improve the bearing capacity of the foundation and the modulus, meet the requirements of constructing various buildings in the saline oil region, save the expenses of foundation treatment and shorten the construction period of the foundation treatment.
Owner:JIAN YAN FOUND ENG

Method for constructing non-filled vibration-compacted sand piles on silty-fine sand foundation

The invention discloses a method for constructing non-filled vibration-compacted sand piles on a silty-fine sand foundation, which includes the steps: firstly, measuring pile positions and setting out lines; secondly, constructing vibration-compacted sand piles, namely, for each vibration-compacted sand pile, setting a vibrator in place, forming a hole for vibration nearby the hole, controlling the vibrator to vertically penetrate into the silty-fine sand foundation to a pile bottom designed elevation at the speed V<descent>; in formation of the hole, using the vibrator to synchronously compact and strength constructed piles around the vibration-compacted sand pile being constructed, performing compaction to form the piles, and controlling the vibrator to slowly ascend to an opening of the hole at the speed V<ascent>; and thirdly, completing construction of the plurality of vibration-compacted sand piles. The method is simple, reasonable in design, convenient in implementation, low in manufacture cost, high in work efficiency, easy for guarantee on construction quality, and can be used for solving the problems that the existing foundation treatment method is high in input cost, complex in construction process, low in construction efficiency, poor in foundation reinforcement effect, unsuitable for deep foundation reinforcement and the like in treatment of the silty-fine sand foundation.
Owner:SCEGC NO 6 CONSTR ENG GRP CO LTD

A high-efficiency solidification method for soft soil sites with high moisture content

ActiveCN109763480BEfficient reinforcementReduce inputSoil preservationSoil scienceEngineering
The invention belongs to the technical field of environment rock-soil engineering and discloses a high-efficiency curing method for a soft soil site with high moisture content. The high-efficiency curing method comprises an in situ chemical curing step and a preloading drainage step; the in situ chemical curing step comprises investigating sites, determining physical and chemical indexes such as depth, area, moisture content, organic matter content, liquid plastic limit and salt content of the soft soil site; blending a curing agent, determining the types, adding ratio, and initial and final setting time of the curing agent based on the physical and chemical indexes; blocking the site, and building partition walls for site blocking in the soft soil site; carrying out chemical curing construction, and uniformly mixing the blended curing agent with to-be-cured soft soil; carrying out preloading drainage construction according to three construction modes of vacuum preloading or surchargepreloading or vacuum surcharge preloading; unloading and repairing the site; after preloading time reaches 28 days, swabbing off drained water from the upper surface layer of curing blocks, unloadingand injecting cement slurry into a drain board for secondary repair and reinforcement by adopting a high-pressure grouting pump.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI

A landfill anti-seepage system and a breakdown monitoring method for prolonging the breakdown time of heavy metal ions

The invention discloses a landfill seepage-proof system for prolonging breakdown time of heavy metal irons and a breakdown method. The system comprises a seepage-proof cushion layer, a number direct current power supply, an electric current sensor, a computer and an alarming device. The seepage-proof cushion layer comprises a lower outer layer high-density polyethylene geomembrane, a lower conductive geotextile, a middle swelling clay layer, an upper conductive geotextile and an upper outer layer high-density polyethylene geomembrane. The upper conductive geotextile is connected with a negative pole of the number direct current power supply to serve as a cathode. The lower conductive geotextile is connected with a positive pole of the number direct current power supply to serve as an anode. Electric field force is applied to the middle seepage-proof cushion layer through the upper conductive geotextile and the lower conductive geotextile, so that the pollution irons of heavy metal and the like move reversely, and accordingly, the service life of the seepage-proof cushion layer is greatly prolonged. A microstructure of the middle swelling clay layer changes into a particle packing structure from an original flocculent structure under the effect of the electric field force, so that the transportation and diffusion of pollutants are better prevented.
Owner:ZHEJIANG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products