Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of composite consolidated soil pavement base course

A construction method and technology for the base, which are applied to the materials and construction fields of the road base, can solve the problems of endangering sustainable economic development, destroying the ecological environment in mountainous areas, and shortening the construction period, so as to reduce the cost of long-distance transportation, shorten the construction period, and prevent water and soil drain effect

Inactive Publication Date: 2009-12-16
王涌
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The transportation and use of these materials seriously pollute the surrounding environment, and the large-scale mining of gravel and lime also destroys the ecological environment of mountainous areas, and also produces soil erosion, resulting in waste of resources and endangering sustainable economic development.
Moreover, the construction period of the conventional road repair method is longer, and the effective construction period is shortened in areas in the north where the freezing time is earlier.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of composite consolidated soil pavement base course

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0080] From Tianshen line to Xinsheng section 13.8 kilometers, the weight ratio of lime and silty soil is 5:95, and the weight of external curing agent is 0.1‰ of the lime-soil mixture. The preparation of the curing agent aqueous solution and the construction of the pavement base course are carried out by the above method.

Embodiment 2

[0082] In the 10-kilometer section from No. 14 to Yaojing, the weight ratio of cement to sandy soil is 4:96, and the weight of external curing agent is 0.16‰ of the lime-soil mixture. The preparation of the curing agent aqueous solution and the construction of the pavement base course are carried out by the above method.

Embodiment 3

[0084] The Xinshui line is 10 kilometers away from Xilu to Yuchang, the weight ratio of lime to clay soil is 6:94, and the weight of external curing agent is 0.13‰ of the lime-soil mixture. The preparation of the curing agent aqueous solution and the construction of the pavement base course are carried out by the above method.

[0085] The material and construction method of the composite consolidated soil pavement base of the present invention are suitable for building the lower base of roads above the second grade and all the bases of the third and fourth grade roads.

[0086] The technical indicators of the composite consolidated soil base pavement structure are as follows:

[0087]

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A composite consolidated soil pavement base material and its construction method, the material is composed of the following components by weight percentage: 92-98% of sandy soil, 2-8% of cement, ZL-1 containing 85% of sulfonic acid Or EN-1 liquid curing agent is 0.1-0.3‰ of the total lime-soil mixture; or ZL-1 with 90-96% silty soil or clay soil, 4-10% lime, and 85% sulfonic acid EN-1 liquid curing agent, 0.1-0.3‰ of the total amount of lime-soil mixture. The material and construction method of this kind of composite consolidated soil pavement base uses widely distributed soil as the main material, which can use local materials, reduce the construction cost by 20-50%, have early strength, shorten the construction period, and resist frost. Areas can extend the effective construction period.

Description

technical field [0001] The invention relates to a material for a highway pavement base and a construction method thereof, in particular to a material for a pavement base built with composite consolidated soil and a construction method thereof. Background technique [0002] At present, the base course of highway pavement is usually made of fly ash gravel, cement stabilized gravel, lime soil, lime soil and other materials, among which fly ash gravel and cement stabilized gravel are generally used for the base of high-grade highways, while fly ash soil and lime soil are used It is used in the base layer of low-grade roads or the sub-base layer of high-grade roads. For these kinds of materials in the plain area, the cost of the project has been increased due to the outsourcing of a large number of materials and the long-distance road and rail transportation. For example, in the road construction in Songyuan area of ​​Jilin Province, the limestone crushed stone structure is adop...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01C3/04C09K17/10C09K17/06
Inventor 王涌
Owner 王涌
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products