W-shape flame boiler for preventing side wall water cooling wall slagging scorification
A water-cooled wall and side wall technology, applied in steam boilers, combustion methods, combustion chambers, etc., can solve problems such as ash melting point drop, ash deposition process acceleration, combustion difficulty, incomplete combustion, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0005] Specific implementation mode one: (see Figure 1 ~ Figure 4 , Image 6 ) In this embodiment, the body of furnace 1, the first wall-attached air bellows 2, the first main air box 3, two secondary air ducts 4, four wall-attached air ducts 10, the second wall-attached air bellows 16, the third The wall-attached wind box 20, the fourth wall-attached wind box 17 and the second main wind box 19 are composed of a front wall 6, a rear wall 7, two side walls 8 and four wing walls (water-cooled walls) 9 The front wall 6, the rear wall 7 and the side walls 8 are arranged in a quadrilateral shape, and the two side walls 8 and the front wall 6, and the two side walls 8 and the rear wall 7 are connected by wing walls 9, and the wing walls The wall 9 is composed of water-cooled wall tubes 13 and fins 14 tightly connected; the first wall-mounted wind box 2, the second wall-mounted wind box 16, the third wall-mounted wind box 20 and the fourth wall-mounted wind box 17 are respectively ...
specific Embodiment approach 2
[0006] Specific implementation mode two: (see figure 1 ) The difference between this embodiment and the first embodiment is that each wall-mounted air duct 10 is provided with a damper 11 . Play the purpose of controlling wind flow. Other compositions and connections are the same as in the first embodiment.
specific Embodiment approach 3
[0007] Specific implementation mode three: (see figure 1 ) The difference between this embodiment and the second specific embodiment is that it adds a first speed detector 12, a second speed detector 22, a third speed detector 21 and a fourth speed detector 18, and the first speed detector 12 is arranged on the first sticker Between the wall wind box 2 and one end of the first main wind box 3, the second speedometer 22 is arranged between the second wall wind box 16 and the other end of the first main windbox 3, and the third speedometer 21 is arranged at the third Between the wall-attached wind box 20 and one end of the second main wind box 19 , the fourth speed detector 18 is arranged between the fourth wall-attached wind box 17 and the other end of the second main wind box 19 . The first speed detector 12, the second speed detector 22, the third speed detector 21 and the fourth speed detector 18 added in this embodiment are used to monitor the flow velocity of the wind in e...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com