Method and device for construction scheduling
A scheduling scheme and technology for construction personnel, applied in the computer field, can solve the problems of unified construction scheduling without internal resources of operators, low efficiency of internal management of operators, etc., and achieve the effect of improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] In order to make the above-mentioned features and advantages of the embodiments of the present invention more obvious and understandable, detailed descriptions will be given below in conjunction with specific implementation manners.
[0042] First introduce the following concepts:
[0043] Scheduling element: Scheduling element is the basis and dependence of the scheduling scheme used in the task assignment process, and is the minimum granularity of the composition of the scheduling scheme, mainly including: location, personnel, time requirements, skills, SLA, etc.
[0044] Scheduling rules: It is the constraint of the scheduling plan on the scheduling elements to determine the construction personnel, including at least the first scheduling rule: the rule of sufficient remaining working time; and the second scheduling rule: the nearest rule, the principle of working hours balance, the rule of minimum workload or The highest skill rules for construction personnel, etc. ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com