Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof

A construction method and technology for concrete piles, which are applied in basic structure engineering, sheet pile walls, buildings, etc., can solve the problems of reducing concrete strength and high cost of anti-corrosion treatment, and achieve the effects of reducing engineering cost, saving materials, and large frictional resistance.

Active Publication Date: 2011-08-03
陕西长嘉建设工程有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] The purpose of the present invention is to provide an anti-corrosion encased concrete cast-in-situ pile for saline soil foundation application and its construction method, to solve the high cost of anti-corrosion treatment of concrete poured-in-situ piles in saline soil areas and the technology that may reduce the strength of concrete problems; and to solve the specific construction method of anti-corrosion concrete cast-in-place piles

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof
  • Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof
  • Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050] Examples see Figure 1 ~ Figure 2 As shown, a kind of anti-corrosion encased concrete cast-in-situ pile applied on saline soil foundation comprises a concrete pile body 14, a steel cage 3 is arranged in the concrete pile body 14, and a flexible rubber cage is wrapped on the bottom and the periphery of the concrete pile body 14 Water-proof anti-corrosion protection cylinder 2.

[0051] The water-proof and anti-corrosion protection tube 2 is formed by hot pressing or welding n-1 layers of geomembrane sandwiched by n layers of polyethylene geotextile bags, n≥2. The geomembrane is polypropylene geomembrane or composite geomembrane. Polyethylene geotextile bags can be filament woven high-strength geotextile bags, woven geotechnical anti-seepage bags, woven geotechnical composite bags or woven geotextiles. It can be two cloth clips and one film.

[0052] see Figure 3 ~ Figure 13 As shown, the construction steps of the above-mentioned anti-corrosion encased concrete cast-...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an anti-corrosion inclusion bored concrete pile used for saline soil foundations and a construction method thereof. The bored concrete pile comprises a concrete pile body in structure, wherein the inside of the concrete pile body is provided with a reinforcement cage, a flexible, watertight and anticorrosive protection tube is covered on the bottom and periphery of the concrete pile body; and the watertight and anticorrosive protection tube is formed by hot-pressing or welding n layers of polyethylene geotextile bags and n-1 layers of geomembranes, and n is not less than 2. The construction method comprises the following steps: injecting cement mortar between pile holes and the watertight and anticorrosive protection tube, then injecting water in the watertight and anticorrosive protection tube to ensure that the watertight and anticorrosive protection tube expands to the pile hole wall, then injecting concrete paste in the watertight and anticorrosive protection tube, discharging water from the watertight and anticorrosive protection tube by using the concrete paste, and obtaining the bored concrete pile when concrete is set. The invention solves the anticorrosive problem of the concrete pile in saline soil areas, effectively reduces the production cost of the anti-corrosion bored concrete pile and satisfies the strength requirements of projects. The anti-corrosion inclusion bored concrete pile of the invention is applicable to the concrete pile construction with anticorrosive requirements and is especially used in saline soil foundations.

Description

technical field [0001] The invention relates to a concrete filling pile and a construction method thereof. Background technique [0002] The anti-corrosion problem of steel structure and concrete in saline soil area has always been the research and development goal of construction industry personnel. Steel and concrete are the main body of various important buildings at present. The structure exposed on the ground can be anti-corrosion by regular brushing with various anti-corrosion materials, but the anti-corrosion of underground projects is more difficult. Because the components are in direct contact with highly corrosive saline soil and brine, it is impossible to regularly brush anti-corrosion materials, so people routinely use the following two methods for anti-corrosion treatment in actual engineering: [0003] (1) Concrete cast-in-situ piles wrapped and protected by thick-walled steel pipes, the wall thickness is generally ≥10mm. Generally, the length of the pile is ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/60E02D5/34
Inventor 黄明
Owner 陕西长嘉建设工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products