Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Embedding accuracy control construction method for embedded part of overlong equipment foundation platform

A technology of equipment foundation and construction method, which is applied in the direction of basic structure engineering, architecture, building structure, etc., can solve the problems of inconvenient control and adjustment of pre-embedded precision, long construction period, low embedding precision, etc., to shorten the installation and construction period, The construction steps are simple and the effect of saving installation materials

Inactive Publication Date: 2012-04-25
SCEGC NO 6 CONSTR ENG GRP CO LTD
View PDF5 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a construction method for controlling the embedding accuracy of the embedded parts of the super-long equipment foundation platform, which has reasonable design, simple construction steps, easy construction quality control and control accuracy. High, good use effect, can solve the problems existing in the existing embedding construction methods of embedded parts, such as inconvenient control and adjustment of embedding accuracy, low embedding accuracy, poor construction quality, high input cost, and long construction period, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Embedding accuracy control construction method for embedded part of overlong equipment foundation platform
  • Embedding accuracy control construction method for embedded part of overlong equipment foundation platform
  • Embedding accuracy control construction method for embedded part of overlong equipment foundation platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] Such as figure 1 A construction method for controlling the embedding accuracy of embedded parts of an ultra-long equipment foundation platform is shown, including the following steps:

[0045] Step 1. Embedded parts and embedded parts installation screw processing: use machining equipment to process the embedded parts 1, and use drilling equipment to drill multiple holes with the same size and uniformity on the processed embedded parts 1. It is a circular through hole arranged vertically. The embedded part 1 is a horizontal steel plate and is embedded horizontally on the top of the foundation platform to be constructed; at the same time, cutting equipment and thread processing equipment are used to process multiple structures and sizes that are the same The embedded part installation screw 2, and correspondingly process a plurality of nuts 3 used in conjunction with the threaded section of the embedded part installation screw 2. The structure and size of the plurality o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an embedding accuracy control construction method for an embedded part of an overlong equipment foundation platform, including the following steps: firstly, processing the embedded part and the installation screw of the embedded part; secondly, molding construction of the lower middle reinforced concrete structure of the foundation platform needing construction: a plurality of vertical reinforcing steel bars extend out from the top of the lower middle reinforced concrete structure under construction of molding and are arranged vertically; thirdly, installing the installation screw of the embedded part; fourthly, installing a nut at the bottom of the threaded section of the installation screw of the embedded part; fifthly, installing and positioning the embedded part; sixthly, installing a nut on top of the threaded section of the installation screw of the embedded par; seventhly, molding construction of the upper reinforced concrete structure of the foundation platform needing construction; and eighthly, subsequent construction treatment. The method has in design, simple construction steps, easy control of construction quality, high construction accuracy and good in use effect, and can solve the problems of the existing embedding construction method of embedding parts that the embedding accuracy is inconvenient to control, the embedding accuracy is low,the construction quality is poor, the investment cost is high, the construction period is long, and the like.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to a construction method for controlling the embedding accuracy of pre-embedded parts of an ultra-long equipment foundation platform. Background technique [0002] With the further acceleration of the construction industry and related manufacturing technologies, in order to meet the production process requirements and ensure product quality, many projects have put forward higher requirements than the current specifications for the construction of equipment foundation embedded parts and equipment installation quality standards. It has brought some technical difficulties to the site construction. Especially in the construction process of the reinforced concrete foundation platform for super-long equipment, when embedding the embedded parts that need to be pre-embedded on the top of the foundation platform for super-long equipment, it is more difficult to cont...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04B1/41E02D27/44
Inventor 石会荣赵长经张雪娥孟文成王志浩李东航张峰李逢博
Owner SCEGC NO 6 CONSTR ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products