Method for constructing anchor cable on sand layer

A construction method and anchor cable technology, which is applied in the direction of foundation structure engineering, construction, sheet pile walls, etc., can solve problems such as the failure of anchor cables to be successfully constructed, threats to building safety, and ground settlement outside foundation pits, etc.

Inactive Publication Date: 2012-07-04
中煤江南建设发展集团有限公司
View PDF6 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the existing anchor cable construction method, when the foundation pit reaches a certain depth and encounters a water-rich sand layer, after the anchor cable is opened, due to the high water pressure in the sand layer, the gap between the casing and the pre-embedded conduit during drilling The gap...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for constructing anchor cable on sand layer
  • Method for constructing anchor cable on sand layer
  • Method for constructing anchor cable on sand layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0014] refer to figure 1 Shown, a kind of anchor cable construction method of sand layer of the present invention comprises the following steps: (1) build support structure, carry out borehole sampling to the foundation of support structure 1 rear side simultaneously, determine the water-rich sand layer 2 The location is 3-8m below the surface, and the thickness is 5m; (2) On the built foundation pit support structure 1, according to the design requirements, drill holes in the foundation on the rear side. In the water sand layer, when the large water pressure may cause water and sand gushing and cause engineering risks, a double-layer structure is used for drilling, that is, an outer casing 5 is set on the periphery of the rotary rod 4 of the drilling rig for drilling, and the outer casing 5 is drilled in the borehole. After the construction is completed, do not pull out, and stay in the water-rich sand layer 2. The specific construction is: first use the outer casing 5 to dri...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for constructing an anchor cable on a sand layer, and belongs to the technical field of supporting of foundation pits. According to the technical point, the method comprises the following steps of: (1) drilling a hole in a foundation on the rear side of a constructed foundation pit supporting structure according to design requirements; (2) cleaning a drilled hole wall; (3) putting the anchor cable into the cleaned hole; (4) filling cement mortar or cement slurry into the hole to fix the anchor cable; and (5) tensioning to lock the anchor cable when the cement mortar or the cement slurry reaches designed intensity. The method is characterized by comprising the following steps of: in the hole drilling process in the step (1), drilling by using a double-layer structure, namely drilling by arranging an outer sleeve at the periphery of a pivoted lever of a drilling machine when the drilled hole is positioned on a sand layer rich in water, and keeping the outer sleeve in the sand layer rich in the water without extraction after hole drilling construction is finished. The method for constructing the anchor cable on the sand layer is easy and convenient to operate and is used for constructing the anchor cable in the foundation pit supporting process; and by the method, sand can be effectively prevented from overflowing out of the sand layer rich in the water.

Description

technical field [0001] The invention relates to a construction method for foundation pit support, in particular to a sand layer anchor cable construction method. Background technique [0002] The construction method of prestressed anchor cables has been widely used in the support of foundation pits. The principle is to use the reaction force provided by the anchor cables and the prestress applied to the supported structure to resist the earth pressure during excavation of the foundation pit. And water pressure, to achieve the purpose of controlling the deformation of the envelope structure. During anchor cable construction, firstly use a drilling rig to drill holes according to the design requirements, then put steel strands and grouting pipes in the drilled holes, and finally pour cement mortar or cement slurry to complete the anchor cable construction. When the cement mortar or cement slurry reaches the design strength, the supporting structure is prestressed and anchored...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/74
Inventor 马文旭李剑成
Owner 中煤江南建设发展集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products