technical field
[0001] The invention relates to a bridge erecting method, in particular to a construction method for assembling and erecting concrete prefabricated beam segments. Background technique
[0002] In recent years, with the continuous development of modern urban construction, traffic problems have become increasingly prominent. There are more and more elevated roads and rail transits in urban areas and suburbs, and urban development requires viaducts and rail transits to be beautiful in shape and high in appearance quality. , Concrete shrinkage and creep are small, and the construction has little impact on the surrounding environment and traffic. The traditional construction method adopts cast-in-place support, which leads to more and more waste in quality assurance and investment, while the overall prefabricated erection construction method requires sufficient site nearby, which is also subject to certain restrictions. Under various conditions, the prefabricated...
Examples
Embodiment Construction
[0032] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and through specific implementation methods.
[0033] A construction method for assembling and erecting concrete prefabricated beam segments, comprising the following steps:
[0034] Such as figure 1 as shown,
[0035] The first step: set several on-site assembly platforms 1 beside the beam line 2 to be erected;
[0036] Among them, the location selection of the on-site assembly platform 1 needs to ensure the implementation of a series of constructions such as segmental transportation, assembly, lifting, and installation; the number of on-site assembly platforms 1 should be set according to the site layout and construction period requirements; Assembled platform 1 should be processed according to the line of the bridge, and the coordinates, elevation and pre-arch of each control point on the line of the bridge must be determined through accura...