Partial discharge synchronous monitoring method for multiple electrical equipment of substation
A technology for electrical equipment and partial discharge, applied in the field of monitoring, to reduce maintenance and repair costs, improve work efficiency and intelligence, and reduce power outages.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] Hereinafter, the method for synchronous monitoring of partial discharge of multiple power equipment in a substation according to the present invention will be further explained in conjunction with specific embodiments and the drawings of the specification.
[0027] Such as figure 1 As shown, this embodiment uses the following method to synchronously monitor partial discharge of power equipment:
[0028] Install a high-frequency shielding bus ring 1 in the substation. The length of the high-frequency shielding total loop line is less than 1000m. Install sensor terminals 3 on the power equipment of the substation. These sensing terminals are connected to the high-frequency shielding bus at the parallel connection point 2 respectively. Parallel connection, and the distance between two adjacent parallel connection points is not less than 25m. Each sensor terminal includes a UHF sensor 31, a UHF broadband amplifier 32 (gain of 40dB), an envelope detector 33 (time constant not gre...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com