Method for adjusting service authorization value of user equipment, user equipment and device
A user equipment and service authorization technology, applied in the field of communication, can solve problems such as inaccurate control of interference on the network side
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 4
[0153] An embodiment of the present invention provides a first user equipment 50, the user equipment is a user equipment with a transmission time interval of 2 ms, such as Figure 5 As shown, it includes: a receiving unit 51 , a determining unit 52 , a storage unit 53 and an adjusting unit 54 .
[0154] The receiving unit 51 is configured to receive the relative authorization command sent by the network side.
[0155] The determining unit 52 is configured to determine the first time interval, where the first time interval is a transmission time interval of a first hybrid automatic repeat request (HARQ) process in which the relative grant command takes effect.
[0156] The storage unit 53 is configured to store the power ratio of the data channel and the control channel of the first user equipment, where the power ratio of the data channel and the control channel of the first user equipment is included in the first transmission time interval, the The power ratio between the da...
Embodiment 5
[0168] An embodiment of the present invention provides a second user equipment 60, the second equipment is a user equipment with a transmission time interval of 10 ms, such as Figure 6 As shown, the device includes a receiving unit 61 , an acquiring unit 62 , a storage unit 63 and an adjusting unit 64 .
[0169] The receiving unit 61 is configured to receive the relative authorization command sent by the network side.
[0170] The acquiring unit 62 is configured to acquire a third transmission time interval, where the third transmission time interval is the first system frame associated with the E-RGCH frame receiving the relative grant command after the first delay and the second delay The transmission time interval corresponding to the second system frame.
[0171]The storage unit 63 is configured to store the power ratio of the data channel and the control channel of the second user equipment, where the power ratio includes: in the third transmission time interval corresp...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com