[0035] A construction method for overlaying concrete prefabricated slabs on airport pavement, such as figure 1 As shown, its construction method includes the following steps:
[0036] Step 1 Damage treatment of the original pavement surface: the original pavement is cement concrete pavement,
[0037] A) Use a cutting machine to cut the damaged area of the original road surface into a regular pentagon,
[0038] B) Use a breaker to break the original road surface in the rectangular area, remove the damaged part to the hard layer, and form a repair pit
[0039] C) Remove the original road surface materials and floating dust in the repair pit, and leave no loose gravel, floating ash, oil, sewage and other sundries on the base,
[0040] D) Use quick-setting quick-hardening mortar to fill and repair pits, vibrate and compact with a flat plate, and smooth the surface;
[0041] Step 2 Pave the isolation leveling layer:
[0042] A) Pave an isolated leveling layer on the surface o...
Embodiment 2
[0053] A construction method for overlaying concrete prefabricated slabs on airport pavement, such as figure 1 As shown, its construction method includes the following steps:
[0054] Step 1 Damage treatment of the original pavement surface: the original pavement is asphalt concrete pavement,
[0055] A) Use a cutting machine to extend the damaged area of the original road surface by 30cm and cut it into a regular rectangle.
[0056] B) Use a small milling machine to break the original road surface in the rectangular area, remove the damaged part to the hard layer, and form a repair pit,
[0057] C) Remove the original road surface materials and floating dust in the repair pit, and leave no loose gravel, floating ash, oil, sewage and other sundries on the base,
[0058] D) The bottom and four walls of the repair pit are evenly coated with sticky layer oil, and the asphalt mixture is used for layered paving and compaction. The thickness of a single compaction is not greater...
Embodiment 3
[0071] A construction method for overlaying concrete prefabricated slabs on airport pavement, such as figure 1 As shown, its construction method includes the following steps:
[0072] Step 1 Damage treatment of the original pavement surface: the original pavement is cement concrete pavement,
[0073] A) Use a cutting machine to cut the damaged area of the original road surface into a regular hexagon
[0074] B) Use a breaker to break the original road surface in the rectangular area, remove the damaged part to the hard layer, and form a repair pit
[0075] C) Remove the original road surface materials and floating dust in the repair pit, and leave no loose gravel, floating ash, oil, sewage and other sundries on the base
[0076] D) Use quick-setting quick-hardening mortar to fill and repair pits, vibrate and compact with a flat plate, and smooth the surface
[0077] Step 2 Pave the isolation leveling layer:
[0078] A) Pave an isolated leveling layer on the surface of th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com