Inner-tube sealing agent formula for automatic production of compounded fireworks
A technology for combining fireworks and a sealing agent, applied in the field of fireworks pharmacy, can solve the problems of simple workmanship, low labor efficiency, poor safety conditions, etc., and achieve the effects of reducing the construction of workshops and facilities, meeting production needs, and reducing production processes.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0010] Use a 4:1 supersaturated aqueous solution of magnesium chloride, inject the mixture of fine sand and magnesium oxide that has been thoroughly baked into the inner cylinder, of which 10 parts of supersaturated aqueous solution of magnesium chloride, 1 part of fine sand, and 4 parts of magnesium oxide . After compaction, the inner cylinder can enter the assembly process. Products need to be stored in the warehouse for 24 hours before they can be used on the production line and leave the factory.
Embodiment 2
[0012] Use a 5:1 supersaturated aqueous solution of magnesium chloride to inject the mixture of fine sand and magnesium oxide that has been thoroughly baked into the inner cylinder, including 4 parts of supersaturated aqueous solution of magnesium chloride, 2 parts of fine sand, and 2 parts of magnesium oxide. . After compaction, the inner cylinder can enter the assembly process.
Embodiment 3
[0014] Use a 6:1 magnesium chloride supersaturated aqueous solution to inject the mixture of fine sand and magnesium oxide that has been thoroughly baked into the inner cylinder, including 7 parts of magnesium chloride supersaturated aqueous solution, 1.5 parts of fine sand, and 3 parts of magnesium oxide. . After compaction, the inner cylinder can enter the assembly process.
[0015] This formula and process can effectively reduce the production process, reduce the construction of factory buildings and facilities, reduce the danger points in the factory area, and reduce the turnover of personnel to meet the needs of automated assembly line production. Products need to be stored in the warehouse for 24 hours before they can be used on the production line and leave the factory.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com