Construction method of mass impedance method monitoring of steel pipe concrete members based on piezoelectric materials

A technology of concrete filled steel tubes and piezoelectric materials, applied in the direction of material impedance, etc., can solve the problems of inability to apply online monitoring, low utilization rate, low material recovery rate, etc. The effect of high input and detection accuracy

Active Publication Date: 2016-08-17
THE FIRST CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The purpose of the present invention is to provide a construction method based on the piezoelectric material-based mass impedance method of concrete-filled steel pipe components to solve the problems that the current detection of concrete-filled steel tube components stays in the test stage and has poor practicability in practical applications. At the same time, it solves the problem that the existing monitoring methods only Single indicator, if other indicators are detected, the construction needs to be re-arranged, the material recovery rate is low, and the utilization rate is low; it also solves the problem of low monitoring accuracy and the problem that the existing technology only uses one method for monitoring and cannot be applied to online monitoring.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of mass impedance method monitoring of steel pipe concrete members based on piezoelectric materials
  • Construction method of mass impedance method monitoring of steel pipe concrete members based on piezoelectric materials
  • Construction method of mass impedance method monitoring of steel pipe concrete members based on piezoelectric materials

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] like Figure 3-6 , Example 1 selected two 18-meter-high concrete-filled steel pipe structural columns hoisted in three sections as test objects. The filling density of the concrete inside the steel pipe and the interface bonding quality of the inner wall of the steel pipe are respectively detected; three detection sections I, II, and III are selected on this column, and six PZT smart aggregates 5 are arranged in each section along the circumferential direction. Paste 6 PZT sheets on the corresponding positions outside the wall.

[0040] like figure 1 It is a process flow chart of the monitoring construction method of the steel pipe concrete member mass impedance method of the present invention. As shown in the figure, a steel pipe concrete member mass impedance method monitoring construction method based on piezoelectric materials includes the following steps:

[0041] Step 1. Develop a detection plan, and use the impedance method to detect the concrete filling densit...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a piezoelectric-material-based construction method for monitoring concrete filled steel tubular member quality through the impedance method. According to the working principle of a PZT substrate, multi-section and multi-layer arrangement is performed on intelligent aggregate and a PZT reactor. The construction method aims to solve the problems that the existing concrete filled steel tubular member quality monitoring method stays in the test period and is poor in practicability to facilitate data acquisition and contrastive analysis. Multiple concrete member quality indicators, such as concrete filling density and the interface bonding quality of concrete on a tube wall, can be detected through one-time construction; in addition, the impedance method is utilized to verify a result, the operation is simple and the detection accuracy is high; the material can be recycled and the utilization rate is high; the detection and the engineering can be carried out simultaneously, the construction of an upper major structure can not be affected, so that the investment in construction period cost is reduced, and the on-line monitoring can be carried out in real time; the method is particularly suitable for evaluating the concrete pouring quality and the interface bonding quality of concrete filled steel tubular members.

Description

technical field [0001] The invention relates to a construction method for monitoring the quality of steel pipe concrete members, in particular to a construction method based on piezoelectric materials, capable of detecting the concrete filling density of steel pipe concrete members and the bonding quality of the steel pipe interface at the same time in one construction, and can be applied online. Background technique [0002] my country's super high-rise building construction is in a period of rapid development. Due to its excellent structural performance, CFST columns are widely used in super high-rise buildings, and the cross-section of CFST members is getting larger and larger. A certain number of original partitions and vertical stiffeners are often arranged on the inner wall of the steel pipe of this type of large-section concrete-filled steel pipe column. The concrete below the junction of the original partition and the steel pipe cannot be vibrated directly and effect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G01N27/02
Inventor 罗晓生李婉琴孙维振徐永东李晓颜庭韵马永红
Owner THE FIRST CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products