Large-sized prefabricated part hoisting device and method
A technology of prefabricated components and hoisting devices, which is applied in the directions of transportation and packaging, load hoisting components, etc., can solve the problems of low work efficiency and difficulty in unloading hoisting tools under water, and achieves high work efficiency, shortens underwater work time, and reduces occurrences. effect of probability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] Such as figure 1 , figure 2 As shown, the large-scale prefabricated component hoisting device provided by the present invention has an inverted T-bar 5 and an auxiliary device. The auxiliary device includes a fixed block 2 and a locking device. The locking device is welded on the inverted T-bar The pin hole 3 and the pin 4 used in conjunction therewith are provided with an insertion hole 6 on the fixed block. The fixed block is located on the upper side of the T-shaped head 1 of the inverted T-bar, and a rotating handle 7 is arranged above the inverted T-bar.
[0024] The method for hoisting large-scale prefabricated components provided by the present invention firstly installs the spreader on land. The operator hoists the inverted T-shaped boom and the auxiliary device to the top of the component at the same time, and the constructor moves it synchronously to directly above the hoisting hole reserved for the component. ; Make the fixed block and the T head on the same hor...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 