Method for splicing flanges of offshore oil delivery pipes underwater
An oil pipeline, underwater docking technology, applied in the direction of pipeline laying and maintenance, pipe/pipe joints/pipe fittings, mechanical equipment, etc., to shorten working time, improve work efficiency, and save installation costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] (3) After the seabed oil pipeline 11 (expansion elbow) flange 22 is in place underwater, unclamp the cable on the seabed oil pipeline 11 (expansion elbow), and untie the string or rope tied on the guide chain 4 Iron wire, the diver passes the guide chain 4 on the lever block 5 correspondingly through several screw holes 3 on the flange 2 of the submarine oil pipeline 1 (flat pipe or riser) laid on the seabed. Several ∏-shaped lock plates 6 made of steel plates are respectively placed on each guide chain 4 from the opening, so that the guide chain 4 is placed in the groove of the lock plate 6, and the two sides of the ∏-shaped lock plate 6 are respectively welded There is a connecting plate 7 perpendicular to the two side plates, the connecting plate 7 is provided with a through hole, and a connecting rod 8 passes through the through hole on the connecting plate 7, and the two ends are bent and fixed, and the guide chain 4 and the locking plate 6 are locked and fixed. Co...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 