Current change rate-based coal mine power grid short-circuiting fault quick judging device and method
A technology of current change rate and short-circuit fault, which is applied in the field of rapid judgment device for short-circuit fault of coal mine power grid based on current change rate, can solve the problems of phase angle speed limit and limit, and achieve the effect of fast change speed and significant change
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Coal mine power grid short-circuit fault rapid judgment device based on current change rate, the device includes current signal acquisition part, signal conversion processing part, calculation and judgment part and man-machine interface part, the system structure is as follows figure 1 shown.
[0034] The signal acquisition part consists of a current transformer CT installed on each line, which is responsible for collecting the current on the line, and the CT converts the large current of the line into a small current.
[0035] The signal conversion processing part is composed of a current transmitter, a multiplexer, a sample holder and an analog / digital (A / D) converter. This part collects the current signal on each line in turn and sends it to the CPU for judgment and calculation.
[0036] Among them, the current transmitter further adjusts the current signal, and converts the current signal on the secondary side of the CT into a weak current signal acceptable to the e...
Embodiment 2
[0043] A rapid judgment method for short-circuit faults in coal mine power grids based on the rate of current change, such as figure 2 , 3 , 4, 5, 6, and 7, it is mainly used to judge the short-circuit fault of the coal mine power grid. In the judgment process, the method mainly includes four stages of judgment calculation: the first stage, the calculation of the first-order derivative of the current; the second stage, the first-order current derivative Judgment of the zero-crossing point of the order derivative; the third stage, the judgment of the first order derivative of the current; the fourth stage, the calculation and judgment of the second order derivative of the current; first enter the first stage, continuously calculate the current change rate of the coal mine power grid line; then enter the second stage , to judge whether the first-order derivative crosses zero, if the first-order derivative crosses zero, enter the fourth stage, and start the calculation of the se...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com