Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Power supply planning method suitable for large-scale access of new energy

A technology for power planning and new energy, applied in circuit devices, AC network circuits, and single-network parallel feeding arrangements, etc., can solve the disorderly construction of new energy power sources, lack of enough attention to new energy sources, deterioration of wind curtailment, and curtailment of light. and other problems, to achieve the effect of alleviating the problem of abandoning wind and light, and realizing large-scale development and grid connection

Active Publication Date: 2016-11-09
SOUTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GROUP CORP +3
View PDF6 Cites 25 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In addition, in terms of power supply planning, the planning of new energy has not received enough attention for a long time, resulting in the disorderly construction of new energy power supplies, which in turn worsened the curtailment of wind and light.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power supply planning method suitable for large-scale access of new energy
  • Power supply planning method suitable for large-scale access of new energy
  • Power supply planning method suitable for large-scale access of new energy

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] Any feature disclosed in this specification, unless specifically stated, can be replaced by other alternative features that are equivalent or have similar purposes. That is, unless expressly stated otherwise, each feature is one example only of a series of equivalent or similar features.

[0034] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0035] Such as figure 1 As shown in Fig. 1 , a power planning method adapting to the large-scale access of new energy sources specifically includes the following steps: Step 1: Predict the load demand, formulate a conventional power supply planning scheme, and formulate the initial new energy installed capacity based on the conventional power supply planning scheme. program; step 2, on the basis of the initial new energy installation plan, calculate the new energy confidence capacity, replace the conventional power supply with the new energy power supply accor...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of power supply planning, and discloses a power supply planning method suitable for large-scale access of new energy. The power supply planning method comprises the following steps of step 1, performing prediction according to load requirements, formulating a conventional power supply planning scheme, and formulating an initial new energy installed scheme on the basis of the conventional power supply planning scheme; step 2, calculating new energy confidence capacity on the basis of the initial new energy installed scheme, and adopting a new energy power supply to replace the conventional power supply according to the confidence capacity to obtain a new energy power supply planning scheme; and step 3, performing new energy consumption capability analysis on the new energy power supply planning scheme; if the new energy consumption capability does not satisfy a new energy rate index, returning to the step 1, and reducing the new energy power supply planning scale; and if the new energy consumption capability satisfies the new energy rate index, completing the power supply planning method suitable for the large-scale access of new energy. By adoption of the power supply planning method, the large-scale development and grid connection of wind energy and solar energy are realized, so that the problems of wind energy and solar energy abandonment are relieved from the power supply planning aspect.

Description

technical field [0001] The invention relates to the technical field of power supply planning, in particular to a power supply planning method adapted to large-scale access of new energy sources. Background technique [0002] In the face of increasingly severe environmental pollution and climate change, new energy represented by wind power and photovoltaics has achieved rapid and substantial development, manifested in continuous increase in installed capacity. While new energy power supply provides clean power, it also brings a series of problems to planning and operation. On the one hand, in order to achieve the goal of reducing carbon emissions and protecting the environment, wind and solar resources are developed on a large scale and connected to the power grid; on the other hand, due to the limited capacity of the system, operators have to abandon wind and light to ensure the safety and reliability of the system However, the high rate of curtailment of wind and light has...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/46
CPCH02J3/46H02J2203/20
Inventor 肖汉傅旭钟胜张玥李彬杨攀峰李泰军王秀丽余熙李嘉逸田昕郑勇秦浩庭冯肯
Owner SOUTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products