Early pre-maintenance method for small hinged joints of slab girder bridges
A pre-maintenance, slab girder bridge technology, used in bridges, bridge construction, bridge maintenance, etc., to achieve the effect of not interrupting traffic, enhancing the ability to transmit shear force, and prolonging service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The present invention will be further described now in conjunction with accompanying drawing.
[0035] see figure 2 , figure 2 Shown is a schematic diagram of an embodiment of the present invention, wherein a slab girder bridge includes a slab girder 1 and a bridge deck pavement 2, and the specific implementation of the present invention is:
[0036] a. The slab girder is fully inspected using the "Hinged Slab Girder Hinge Seam Condition Detection Method", and it is determined that the slab girder bridge has early damage to the hinge joint and is repaired by the pre-maintenance repair process;
[0037] b. Drill φ32 holes on the side of the plate beam with a 45°~60° oblique water mill (forming the hole 5);
[0038] c. From the bottom of the plate beam, use a high-pressure water gun to clean the dust and debris between the plate gaps 3;
[0039] d. In order to ensure the grouting effect, the two ends and the bottom of the grouting area 4 are blocked;
[0040] e. Set...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



