Construction method for controlling backfill compaction degree of silty clay
A technology of silty clay and construction method, applied in filling, soil protection, infrastructure engineering and other directions, can solve the problems of poor water permeability, difficult operation and difficult compaction of silty soil, and reduce the number of compaction times. , Simple operation, cost-saving effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The technical solutions of the present invention will be further specifically described below through specific examples, but the present invention is not limited to the examples.
[0020] A construction method for controlling the compaction degree of silty clay backfill according to the present invention mainly includes backfill height marking setting, leveling and watering of the base, watering of backfilling silty clay, layered backfilling of silty clay (each layer is backfilled twice) , watering between layers, compaction and other steps.
[0021] The backfill control line is set, and the backfill height is mainly marked with red paint on the side wall of each grid, and the backfill height of each layer is 200mm; the thickness of the backfill soil can be controlled through the thickness control line to achieve full thickness tamping during the compaction process and layers between layers Sprinkling is mainly through this method to make the moisture content of the ful...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

