Construction method for narrow-strip sand fixing net sand f barrier
A construction method and technology for sand-fixing nets, which are applied in soil protection, infrastructure engineering, construction, etc., can solve the problems of plants being eroded by wind and sand, high straw transportation costs, and high construction costs, so as to improve the quality of wind erosion resistance and enhance the resistance to wind erosion. Wind erosion ability, the effect of improving the sand fixation effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2017-09-01
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of sand control engineering, in particular to a construction method for sand barriers with narrow sand-fixing nets. Background technique
[0002] At present, in desertification control, grid sand barriers, sandbag sand barriers, and grass grid sand barriers have been widely used to fix the mobile desert, and then plant psammophytes on the fixed desert. Due to the high transportation cost and high construction cost of the straw grids, and the straw grids will lose their sand-fixing function due to weathering and corrosion in three years, so that the planted plants will face the situation of being eroded by wind and sand again; The cost per unit area of grid and sandbag sand barriers is much higher than that of grass grid sand barriers, which is an economic burden that cannot be borne by large-scale sand control projects. The applicant previously provided a method for sand-fixing sand ridges with U-shaped s...
Examples
Embodiment Construction
[0021] Now the present invention will be further described according to the accompanying drawings:
[0022] As shown in the figure, a construction method of a narrow sand-fixing net sand barrier of the present invention is characterized in that the narrow sand-fixing net 1 is between 20cm and 36cm in width and between 10cm and 12cm in length, and has a porosity of between 20cm and 36cm. Between 10% and 25% plastic mesh.
[0023] Draw a construction line 2 on the desert according to the landform. The construction line 2 can be a straight line with an interval of 40cm to 120cm, or a curve, which can be continuous or section by section; flattened narrow strips The center line of the sand-fixing net 1 overlaps the construction line 2 in parallel, spread out a narrow sand-fixing net at an interval of 10cm to 12cm, take the sand-fixing net inserter, and insert the narrow sand-fixing net 1 on the desert in sequence along the construction line 2 , make the top edge of the narrow sand...