A technology of area and flow velocity, applied in the field of greening system in different flow velocity areas under water, it can solve the problem that long-term greening cannot be realized in large areas of water, and achieve the effect of convenient and fast construction, reduced soil erosion, and good plasticity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Such as figure 1 and figure 2 As shown, an underwater greening system with different flow velocities,
[0040] Including at least one cement blanket greening container 8 installed on the side cement blanket greening container 7 and the bottom of the water channel 10 respectively;
[0041] In the side cement blanket greening container 7, a plurality of circular arched greening container units 9 are evenly arranged on the side of the water channel 10 through the side anchor rod 11 along the water flow direction, and the circular arched greening container unit 9 is the circular arched cement blanket main body 2 and the water channel. 10. The side container body with the top surface opening formed on the bottom surface and the side surface. The first soil layer 12, the first gravel layer 13 and the first fixed mesh layer 14 are respectively arranged in the side container body from bottom to top;
[0042] In the cement blanket greening container 8, the two ends of the cem...
Embodiment 2
[0050] A method for afforesting underwater areas with different flow velocities by using the above-mentioned afforestation system, the method includes the following steps:
[0051] Step 1: Before the start of construction, survey the water channel to be constructed, record the height of the water channel, terrain, etc.; according to the height of the water channel, prefabricate the cement blanket into a round arched cement blanket body of the required height 2. The first wave type cement The blanket side panel 8-1 and the second wave-shaped cement blanket side panel 8-2 are provided with a plurality of seepage holes 3 at the corresponding positions of the arched cement blanket main body 2;
[0052] Step 2: Fix and install multiple arched cement blanket main bodies 2 made of cement blankets on both sides of the water channel 10 through side anchor rods 11;
[0053] Step 3: pour water on the cement blanket of the arched cement blanket main body 2 to make it soak completely;
[...
Embodiment 3
[0061] Also can according to the height of water channel, parameters such as topography, make solidified circular arched greening container unit 9 and cement blanket container body with cement blanket in factory, then the silt in the water channel is cleaned up, anchor with many glass fibers The circular arch greening container unit 9 and the cement blanket container body that are made are respectively installed on the both sides and the bottom of the water channel 10, and then the first soil layer 12, the first soil layer 12, the first soil layer 12, the first soil layer 12 are set respectively according to step 5 and step 9 of embodiment two. A gravel layer 13 and the first fixed mesh layer 14; the second soil layer 15, the second gravel layer 5 and the second fixed mesh layer 6, namely to complete the greening of different flow velocity areas under water.
[0062] When it is necessary to carry out post-replacement maintenance, the two adjacent glass fiber anchor rods are use...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com