A post-casting tape inflatable arc angle rectangular hose side formwork support construction method

A construction method and post-casting belt technology, which can be used in the processing of building materials, construction, building components, etc., and can solve problems such as insufficient power.

Active Publication Date: 2020-10-23
FUJIAN JIANGXIA UNIV
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, inflatable polyester fiber reinforced mesh + PVC coated hose (round) is usually used as side form support in post-casting belt construction technology, but with the increasing requirements for the overall structural quality of engineering buildings in modern society High, the current construction technology is obviously unable to do what it wants, so in order to ensure the construction quality, improve the construction efficiency and reduce the construction cost, it is necessary to carry out technical innovation on the support of the post-cast belt side form

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A post-casting tape inflatable arc angle rectangular hose side formwork support construction method
  • A post-casting tape inflatable arc angle rectangular hose side formwork support construction method
  • A post-casting tape inflatable arc angle rectangular hose side formwork support construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0054] Embodiment 1, the base plate thickness is 100-300mm.

[0055] Lay the lower template 1 first, bind the bottom reinforcement 2 on the upper side of the lower template, and set a pair of wooden strips 3 for plugging on the lower side of the bottom reinforcement and the lower side of the area used to form the post-casting belt; Bind the steel bar bracket 4 on the upper side of the wooden strip, and install a curved rectangular hose 6 on both sides between the steel bars; bind the gluten 7, and set interception on the upper side of the gluten and above the hose Wooden square 8, so that it can be used to intercept concrete when pouring concrete later. The area between the two sidewalls of the two hoses forms a post-casting belt, and the steel bars in the post-casting belt are penetrated.

[0056] In this embodiment, the steel bar bracket is made of steel bars with a diameter of 14mm arranged at a distance of 500mm, so as to reinforce the air column (hose), reduce the latera...

Embodiment 2

[0057] Embodiment 2, the thickness of the foundation base plate is greater than 300mm and less than 600mm without water-stop steel plate.

[0058] Lay the lower formwork 1 first, and tie the bottom reinforcement 2 on the upper side of the lower formwork, and a pair of wooden strips 3 are arranged between the bottom reinforcement and the lower formwork and on the lower side of the area for forming the post-casting belt 20, so as to be used for plugging; Install the steel bar support 4 on the bottom bar and on the upper side of a pair of wooden strips, and set the limit steel bar 5 forming the air column installation cavity between the outside of the steel bar support and the steel bar support; put 2 hoses 6 from bottom to top The top is installed in the air column installation cavity; the gluten 7 is bound, and wooden squares 8 are respectively arranged on the upper side of the gluten and above the air column installation cavity, so as to be used for intercepting concrete during...

Embodiment 3

[0061] Embodiment 3, the thickness of the foundation bottom plate is greater than 300mm and less than 600mm, and there is a waterproof steel plate.

[0062] Lay the waterproof coiled material 13 in the preset cushion layer recess 12, bind the bottom rib 2 on the upper side of the cushion layer, and set a pair of Concrete bar 14; bind the first steel bar bracket 4 on the bottom bar and on the upper side of a pair of concrete bars, and bind the second steel bar bracket 16 on both sides of the first steel bar bracket respectively, located on the first steel bar bracket and the second steel bar bracket. A hose installation cavity is formed between the reinforcement brackets; water-stop steel plates 10 are arranged on both sides of the hose installation cavity to abut against the upper ends of the first reinforcement bracket and the second reinforcement bracket respectively, and the water-stop steel plates and a U-shaped steel bar The lower end of the hoop 15 is welded; two superim...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a post-cast strip side mold support construction method; an inflatable arc angle rectangular flexible pipe is arranged in a gap between an upper layer steel bar and a lower layer steel bar in the post-cast strip position; in inflation, the arc angle rectangular flexible pipe is extruded by the upper and lower layer steel bars so as to fill the gap caused by the steel bars;the soft pipe is inflated to form an air column so as to space the concrete; the cross section outer contour of the arc angle rectangular flexible pipe is an arc-shaped rectangular shape; the arc angle rectangular is a rectangular with four arc-shaped corners, and is an axially symmetrical and centrosymmetric geometric figure; the arc angle rectangular flexible pipe comprises a soft pipe outer wall and a soft pipe inner wall; the soft pipe outer wall cross section is the cross section contour of the arc angle rectangular flexible pipe, i.e., an arc angle rectangular; the soft pipe inner wallcomprises an upper pipe inner wall, a lower pipe inner wall and a common inner wall; the area enclosed by the upper pipe inner wall and the lower pipe inner wall is an air pump pressurization area; anarea enclosed by the soft pipe outer wall, the lower portion of the upper pipe inner wall and the upper portion of the lower pipe inner wall is an air connection area; the common inner wall has a constant pressure hole. The method employs the inflatable arc angle rectangular flexible pipe support, is good in moulding effect, high in construction quality, and high in efficiency.

Description

technical field [0001] The invention relates to a post-casting tape inflatable arc angle rectangular hose side form support construction method. Background technique [0002] With the rapid development of social economy in the new era, the development of my country's construction industry is also showing a trend of rapid development. In order to meet the needs of social development at the present stage, especially the needs of architectural functions and appearance, high-rise main buildings and low-rise skirt buildings are often connected together, and the scale of engineering buildings gradually tends to be super-long and super-large. The use of post-pouring tape construction technology can not only improve construction efficiency, improve building quality, but also improve appearance. At present, inflatable polyester fiber reinforced mesh + PVC coated hose (round) is usually used as side form support in post-casting belt construction technology, but with the increasing re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/00E04B1/66
CPCE04B1/66E04G21/00
Inventor 蒋国平张镔锋肖三霞
Owner FUJIAN JIANGXIA UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products