Calculation method of power station deviation electricity based on virtual reservoir

A technology of deviation power and calculation method, which is applied in calculation, complex mathematical operation, data processing application, etc., can solve problems such as unbalanced power, complex and changeable causes, and comparative analysis of the operation of deviation power reservoirs.

Active Publication Date: 2021-07-06
CHINA YANGTZE POWER
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0010] The complex power grid operation and the numerous comprehensive tasks of the power station make the original two calculation methods of deviation electricity unable to reflect the actual situation of power station operation scientifically and fairly. Adjustment, not unanimously approved by both grids
[0011] Due to the complex and changeable reasons for the deviation of electricity, the consequences cannot be reproduced, and it is impossible to conduct a comparative analysis of the real reservoir operation whether the deviation of electricity is generated or not. In addition, the deviation of electricity also has cumulative effects in time and space. How to quickly and Accurate and scientific calculation of deviation power has no successful precedent so far, and it has become an urgent problem to be solved in dispatch management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Calculation method of power station deviation electricity based on virtual reservoir
  • Calculation method of power station deviation electricity based on virtual reservoir
  • Calculation method of power station deviation electricity based on virtual reservoir

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The principle of the calculation method of power station deviation electricity based on virtual reservoir is as follows:

[0027] The concept of virtual reservoir, that is, the principle of allocating reservoir resources based on the power distribution ratio is referred to as "power distribution water" hereafter, and the inbound water volume and reservoir storage capacity are allocated according to the power distribution ratio, and the left and right bank virtual reservoirs are respectively established corresponding to the left and right bank power stations .

[0028] The virtual reservoir believes that the two reservoirs on the left bank and the right bank are completely independent and do not support each other. The operation of the virtual reservoir must undertake comprehensive tasks according to the power distribution ratio. In the calculation, the calculation is based on the satisfaction of the constraints. In order to satisfy the constraints, the virtual outflow o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

Based on the calculation method of power station deviation power in the virtual reservoir, when the actual power generation of the left and right power stations does not meet the constraint conditions, the power is increased to meet the constraint conditions, and the increased power is counted as the left and right bank correction power, and the actual power generation plus correction The power is the virtual power of the power station, and the left and right virtual power is used to calculate the deviation power. The deviation power in the left\right period: according to the power distribution ratio, the left bank\right bank generates more power. If the value is positive, the left bank\right bank needs to return power to the right bank\left bank ; If the value is negative, the right bank\left bank needs to return electricity to the left bank\right bank. Left\right corrected power: If the left\right bank power station does not meet the constraint conditions, calculate the left\right daily corrected power, if the constraints are satisfied, the left\right bank corrected power is 0. On the basis of the virtual reservoir, the present invention establishes a calculation method for the deviation electric quantity which fully considers the comprehensive task undertaken by the power station, and achieves fast, scientific and fair calculation of the deviation electric quantity.

Description

technical field [0001] The invention relates to the technical field of water conservancy and hydropower, in particular to a method for calculating the deviation electric quantity of a power station based on a virtual reservoir. Background technique [0002] The Xiluodu Reservoir is located in the lower reaches of the Jinsha River, at the junction of Sichuan and Yunnan. The power dispatching on the left and right banks belongs to the State Grid and the China Southern Power Grid. The two power stations operate independently, with no electrical connection in between. According to the National Energy Administration, the power distribution ratio of power stations on the left and right banks is 42:58 during the dry season (November-December, January-May), and 50:50 during the wet season (June-October). According to the agreement between the two power grids and Xiluodu Power Plant: when the actual power generation on the left and right banks is not balanced according to the specifi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/06G06F17/18
CPCG06Q50/06G06Q10/0637
Inventor 张慧唐勇唐红兵赵云发王玉华任新楷王文军
Owner CHINA YANGTZE POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products